Anne Arundel County. MACo Winter Conference January 7, 2011. Chesapeake Bay TMDL Pollutants of Concern. Nitrogen Phosphorus Sediment. TMDL Allocation and Gap Determination. Existing Conditions Without BMP’s. Credit for existing. BMPs + Retrofits. Current Conditions. 2009 Progress. Gap.
E N D
Anne Arundel County MACo Winter Conference January 7, 2011
Chesapeake Bay TMDLPollutants of Concern Nitrogen Phosphorus Sediment
TMDL Allocation and Gap Determination Existing Conditions Without BMP’s Credit for existing BMPs + Retrofits Current Conditions 2009 Progress Gap Required Reduction Reducible Load Pollutant Load Bay TMDL Allocation E3 (Limit of Technology) 2009 2025
Anne Arundel County Chesapeake Bay TMDL Allocation Total Nitrogen = 2.460 million lbs/yr Total Phosphorus = 0.151 million lbs/yr Sediment = TBD
Pollutant Source Sectors Wastewater Treatment Plants (WWTPs) Septic Systems Stormwater Runoff Agriculture
Pollutant Source Sector Actors Actors Where County Assumes Responsibility County WWTPs Privately Owned Septic Systems County Stormwater Runoff Actors Where County Does Not Assume Responsibility Minor Municipal WWTPs Minor Industrial WWTPs Major Industrial WWTPs Fort Meade WWTP Federal Lands – Stormwater Runoff State Lands – Stormwater Runoff City of Annapolis – Stormwater Runoff Agricultural Lands – Stormwater Runoff
Anne Arundel County Core Implementation Strategy (1) WWTPs Upgrading WWTPs to Enhanced Nitrogen Removal Capacity (2) Septic Systems Sanitary Sewer Extensions and Satellite Cluster Systems (3) Stormwater Retrofits Stormwater Outfall Restoration Stormwater Pond Restoration (4) Headwater Stream Erosion Prevention Stream Channel Restoration Ephemeral Channel Restoration
Point Source WWTP Participants County Government WWTPs (≈ $270,000,000) Federal Government WWTPs Private Sector WWTPs
Septic System Participants County Sanitary Sewer Extensions and Satellite Cluster Systems (≈ $800,000,000) Private Sector Septic Systems
Stormwater Retrofit Participants County Government (≈ $400,000,000) State Government Federal Government City Government Agriculture Privately Owned Land
Headwater Stream Erosion Prevention Participants County Government (≈ $400,000,000) State Government Federal Government City Government Agriculture Private Sector
Ultimate Goals • Restored Stream Stability • Restored Hydrology within Floodplains and Streams • Restored Biological Health of Streams • Compliance with Water Quality Standards
Step Pool Stormwater Conveyance (SPSC) Restoration Strategy 14
What is the Potential Cost to Anne Arundel County? County WWTPs (≈ $270,000,000) Sanitary Sewer Extensions and Satellite Cluster Systems (≈ $800,000,000) Stormwater Retrofits (≈ $400,000,000) Headwater Stream Erosion Prevention (≈ $400,000,000) TOTAL ESTIMATED COST: $1.87 Billion