An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WEST THOMAS STREET PEDESTRIAN AND BICYCLE OVERPASS Seattle Design Commission Update – October 15, 2009

  2. WEST THOMAS STREET PEDESTRIAN AND BICYCLE OVERPASS Summary of Seattle Design Commission • December 2004 • Suggestion to span over Elliott Ave and/or improve Elliott Ave crossing • Design bridge to be “simple”, “minimal”, and “harmonious and complimentary” • July 2006 • Support the extended scope to include extending overpass across Elliott • Support “simplicity of ramps and pursuit of design elegance” • Design treatments, especially throw fence • December 2006 • Addition of stairways • Consider ramp to touch down on W. Harrison St. • Curved alignment for the bridge • January 2008 • Re-evaluate design to consider natural setting • Concerns related to the Elliott crossing, pedestrian improvements versus overpass • Phasing of the project due to funding • February 2008 • Inclusion of stairs at Elliott Ave. • Inclusion of belvedere at Park and West Thomas triangle • Functional but considers safety of users. • Use of “green” technology and compliment Park setting

  3. WEST THOMAS STREET PEDESTRIAN AND BICYCLE OVERPASS

  4. WEST THOMAS STREET PEDESTRIAN AND BICYCLE OVERPASS Project Status • Evaluate Project Funding • Conducted Value Engineering study to re-evaluate design • Re-evaluate current scope • Shorten structure • ADA compliance • Future expansion • Pedestrian improvements at Elliott Ave • Streamlining architectural enhancements • Minimize special fabrication • Use of standard steel sections • Consider future maintenance costs • Consider color scheme • Phased construction • Construction of intermediate access points • Build structure over railroad, future expansion over Elliott Ave • Consider future maintenance costs • Consider color scheme

  5. WEST THOMAS STREET PEDESTRIAN AND BICYCLE OVERPASS Design Moving Forward • Maintain alignment • Maintained a “simple” and “minimal” design using smooth tube sections • Use of surface mounted pedestrian luminaries and consider accent lighting fixtures ~10’ • Maintain belvederes and design structure for future intermediate access • Incorporate art enhancements based upon Potlatch Trail art concepts (SDC 2002) • Complete design expeditiously and as efficiently as possible • Continue seeking alternative funding sources • Goal to provide access and preserve natural setting