200 likes | 363 Views
ExxonMobil BBS web tool Version June 2011. What has changed. Alert Observations Project number Observation time Unannounced Observations Field verification and validation process Reports Selection criteria
E N D
What has changed • Alert Observations • Project number • Observation time • Unannounced Observations • Field verification and validation process • Reports • Selection criteria • Stewardship reports for AO Validated, active users, AO’s and Questionable items • AO DTR • Layout • Job description added as quality criteria • Near miss • Layout • Actual versus planned closing date • OIMS system reference (ExxonMobil only) • JSA DTR • Button added on 1st level
What has changed – Alert Observations • Project #: • Field added to cluster AO’s per project • Convention • the apro number is to be used for Coteba/Artelia projects • TBD for ABB programs
What has changed – Alert Observations • Time: • Time plus AM/PM indication changed into 24 Hrs clock • Convention • HH:MM format to be used
What has changed – Alert Observations • Unannounced AO: • Field ( Yes/No) added to indicate if the AO was announced or not • Unannounced means that the observer appears on site without giving a heads up or pre-notice to the persons observed • One should strive to maximize the number of unannounced visits
What has changed – Alert Observations • Description of Task & Background Information / Work Conditions: • Importance of this field is raised and it is added on the AO DTR template as a separate item
What has changed – Alert Observations • Questionable Item #: • Field protected from direct input • QI are picked up by the system from Page 2 of the AO • Signature field has been eliminated
What has changed – Alert Observations • Field verification and validation: • In the field follow up and Quality review of the recommendation that were implemented to confirm: • Effectiveness and Sustainability over time • Should be performed 1-3 months after the confirmed implementation date Field Verification and Validation new
What has changed – Alert Observation DTR • Page 2 Positive comments / Questionable items • Split into 2 sections • Page 1 Job description • Added Split new
What has changed – Alert Observation DTR • Field Verification and Validation process • No longer obsolete new Split
What has changed - Reports • AO Count Report - Vendors working for >1 OSP • Selection of AO’s is now based on the OSP selected in the AO form when completing the AO • In the past the selection was based on default OSP, resulting in incorrect counts • Test vendor has performed 124 AO’s for work ordered by OSP 1 and 6 for work ordered by OSP 2 Test Vendor OSP1 selected Test Vendor Test Vendor OSP2 selected Test Vendor
What has changed - Reports • LPO Validated • Stewardship report to monitor the completion of the field verification and validation (V&V) • Verification and validation takes place 1-3 months after the implementation • Report is general indicator if verification is still required • The AO list gives detail which AO’s need V&V
What has changed - Reports • LPO Validated – continued • The AO list gives detail which AO’s need V&V • Vendors can order by clicking on the “Field Validation completed? “ column in the header
What has changed - Reports • Questionable items per month and YTD • Stewardship report to monitor quality of AO process and indirect also the application of the deeper dive tools Test Vendor Test Vendor
What has changed - Reports • Active users • Stewardship report to manage the User Base • Every vendor should have at least one user that has admin rights, if not, contact ABB or Coteba/Artelia • enables that user to create new users and to change the status to inactive of users that are not longer participating
What has changed – JSA DTR • “Add Default JSA DTR” button • Button added on first JSA DTR level to open blank JSA DTR template new
What has changed – Near Miss • New layout of the Near miss / hazard identification form • more logical flow
What has changed – Near Miss • Added reference to OIMS system (ExxonMobil only) • Added “Actual Completion Date” versus “Expected Completion Date” new new