1 / 4

Seismology programme Structure of the SWG

Seismology programme Structure of the SWG. 98-06 – preparation phase: DAT(T. Appourchaux), Seismic interpretation (G. Berthomieu) , excitation and amplitudes (I. Roxburgh), fast Rotation-perturbative (M.J. Goupil), Fast rotation –nonperturbative (M. Rieutord), … 06-… - exploitation phase:

kalli
Download Presentation

Seismology programme Structure of the SWG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Seismology programme Structure of the SWG • 98-06 – preparation phase: • DAT(T. Appourchaux), Seismic interpretation (G. Berthomieu), excitation and amplitudes (I. Roxburgh), fast Rotation-perturbative (M.J. Goupil), Fast rotation –nonperturbative (M. Rieutord), … • 06-… - exploitation phase: • DAT (T. Appourchaux), ESTA (M. Monteiro), B-O stars (C. Aerts), Be stars (C. Neiner), Delta Scuti stars (E. Poretti), Giants (J. De Ridder), PMS (K. Zwintz), … Solar-like puls.(…)

  2. Seismology programme Publication policy and N3 products Three type of publications: Type 0: oriented Instrumental - Project team (see doc. Publication Policy 11/09/06) + (data reduction ?) Type 1: data analysis (for each star)  N3 productes proposed by the DAT (see doc.in min SC15): oscillation modes parameters (freq., amplitudes, widths, phases, splittings…) – some DAT team + ‘builders’ as defined in doc. ‘…’ Type 2: - Modeling and interpretation works: in the hands of Co-Is+teams during priority period (Under CS supervision as define in Publi Policy doc) - Complementary analysis (specific analysis) E. Michel COROT-CS 20 – 15/09/06- Paris E. Michel COROT-CS 20 – 15/09/06- Paris

  3. Seismology - Observation programme CoRoT book (Michel, Deleuil and Baglin): IR01: settled, a list of targets exists. IR02: settled, a list of targets exists LRC1:settled, a list of targets exists SRC1: settled, a list of targets is discussed LRA1: settled, a list of targets exist SRA1: Add Programme, list of targets tbd LRC2: SWG produced a list of targets, position tbc by ECO SRC2: tbd LRA2: SWG produced a list of targets, position tbc by ECO SRA2: tbd LRC3: principal target settled,list tbd SRC3: tbd LRA3: principal target settled, list tbd … E. Michel COROT-CS 20 – 15/09/06- Paris

  4. Seismology - Observation programme 50209 v=8.4 (Be) 50230 v=8.9 49294 v=7 (Vsini=111) E. Michel COROT-CS 20 – 15/09/06- Paris 49808 v=8 (Vsini=114) 49862 v=9.47 (Ap) 49385 v=7.9 (sol) 49434 v=5.75 (G Dor) 171834 52265 v=6.3 (sol+plan) 49933 v=5.8 (sol)

More Related