LARP Accelerator Systems: The Meeting Outcome (“unpolished” view)

US LHC Accelerator Research Program. bnl - fnal- lbnl - slac. LARP Accelerator Systems: The Meeting Outcome (“unpolished” view). Vladimir Shiltsev. FY07 AS Priorities & Goals. Lumi-Monitors: construct, install, start commissioning

kaloni
Download Presentation

LARP Accelerator Systems: The Meeting Outcome (“unpolished” view)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US LHC Accelerator Research Program bnl - fnal- lbnl - slac LARPAccelerator Systems:The Meeting Outcome(“unpolished” view) Vladimir Shiltsev

  2. FY07 AS Priorities & Goals • Lumi-Monitors: construct, install, start commissioning • Tune&Coupling FB: deliver design, participate in installation and commissioning • Schottky: participate in installation and commissioning • Hardware Commissioning: execute the plan (5-7 people) • Beam Commissioning: develop detailed Long Term Visitors TV plan for FY08+ by ~mid-FY07 • Other tasks: execute Task Sheet’s Plans • “5+1”: develop FY08 plan (incl. new tasks) by ~June’07 LARP Collaboration Meeting

  3. 1.1.1 Tune & Coupling FB (310k$) • Excellent progress with design and tests in RHIC with protons (Run 6) • Many new phenomena in Run 7 Gold-Gold • Not clear whether relevant to LHC but shows possible areas of concern • Successful “Proof-of-principle” continuous head-tail Q’ with BBQ at Tevatron • Of interest for CERN, still some q’s remain • The task could be wrapped up in FY07: • commissioning efforts and costs could be moved to “Commissioning” task • Very importants to participate in commissioning (one of deliverables LARP subscribed into, also excellent “plug-in” to beam commissioning, LHC beam physics, etc) • New Quadrupole mode analysis proposed (below) • LAFS is going to develop saftware for tune msmnt system LARP Collaboration Meeting

  4. 1.1.2 Luminometer (994k$) • No delays, everything more or less on track • Thanks to RHIC Run 7 – important tests • Installation in LHC will start in Oct’07 • No gas flow thru ionization chambers initially (only when L will be high) • Reference transistors added to quantify dark current vs rad dose • DAQ and control system development to be done later • Estimated FY08 need 880k$ • About half of that can be qualified as commissioning • About 400k$ will be needed in FY09 • Pulse shaping, commissioning, etc • Getting extra funds in 2nd half of FY07 (contigency funds) will reduce FY08 budget request LARP Collaboration Meeting

  5. 1.1.4 4.8 GHz Schottky (122k$) • Everything is “~ on budget” and on-time • May 1-11 visit to CERN • Starts commissioning period: no beam  with beam • Tevatron is already interested in the new electronics developed for LHC (ordered the same for operation – better S/N) • RHIC is interested, too! • The task is essentially finished: • formal sign-offs after first beam tests • commissioning efforts and costs could be moved to “Commissioning” task • Very importants to participate in commissioning (one of deliverables LARP subscribed into, another excellent “plug-in” to beam commissioning, LHC beam physics) • Overall: promise to become a “success story” • Can LAFS took over data processing software? LARP Collaboration Meeting

  6. 1.1.5 AC Dipole (80k$) • Figured out the way to do that inexpensively using existing kicker (pinger) magnets and commercially available high-power audio amplifiers • Excellent results in the Tevatron • ~3sigma oscillations for >8000 turns • Deeper insight into physics processes • Beta-functions agree with other methods • Some 20k$ of M&S and 140k$ will be requested for FY08 • Also, has significant commissioning component LARP Collaboration Meeting

  7. 2.1 Commissioning (540k$) • Hardware and IR commissioning go as planned • Three more HW commissioners scheduled • First HW commissioners will start to return • FY08 plans to be reconsidered to incl Shutdown work • Beam Commissioning: • LTVAC came out with 12 “real” names of LTVs and 5 “possible substitutes/later” names (out of 70 expressed interest) • Thanks to Mike S. and the Committee! • Now on me and, later, Steve, to take into account: • CERN’s input (names are being considered, input next week) • Balance : Junior/Senior, Labs, tasks, LTV/Short term Visitors, HW comm.,need of a local coordinator, budget (with Mike’s input/analysis) • … and come out with a plan and backup option(s) for FY08 and (in part) FY09 – by June (?) LARP Collaboration Meeting

  8. LHC@FNAL and LAFS (0k$) • Will define how to use LHC@FNAL (Tan and Rama) in ~2 weeks: • draft “wish list of functions” for remore participation in SPS commissioning and MDs in June-July 2007 • Pre-CERN training: • (Dave McGinnis) are there rookie books? • (Alex Chao) how SLAC people can benefit from the LHC@FNAL? • (Oliver) start “plugging in”: short term visits and then continue training/participating here • LARP/other labs to support LAFS - ?: • (Dave McGinnis, Hermann and Steve P. to talk) LARP Collaboration Meeting

  9. 3.1.1 Cleaning Eff Studies (50k$) • Compare RHIC loss maps with code prediction • To benchmark the code used for the LHC Collimation system design • Obvious progress: • Guillaume Robert-Demolaize • 4-6 mos needed to comlete the first round of analysis • If no outstanding problems found – close the task and move on new initiatives? (TBD) LARP Collaboration Meeting

  10. 3.2.1 Rotating Collimator (783k$) • Goes ~as planned • CERN strategy for Phase II : • Compare 3 competing technologies at the SPS beamline • RC is one of them • No good idea yet for ion primaries (secondaries?) • Will need ~same funds in FY08 (and ‘09…) LARP Collaboration Meeting

  11. 3.2.2 Tertiary Collimators (15k$) • A lot of results reported/ delivered to CERN: • (more results, more interest, more questions, more details to explore) • Might be a never-ending story • Can the task be finished in FY07? (TBD) • (remaining small efforts can be buried in a bigger task) LARP Collaboration Meeting

  12. 3.2.3 Irradiation Studies (82k$) • A lot of results reported: • Very thorough studies (as usual), tons of data analysis • No bad surprises (contrary to Carbon-carbon) • Can the task be finished in FY07? (TBD) • Can BLIP facility be used for other tasks or new initiatives? (TBD) LARP Collaboration Meeting

  13. 4.1 Accelerator Physics (635k$) • E-cloud: • new results, still of interest and importance • Focus shifting from LHC to inectors • IR and beam-beam: • Too many IR upgrade options on the table, a lot of effort needed to consider main 4 (Oliver’s lists) on systematic basis • Available US resources: 1.5 “lattice-ists” at FNAL, 1-2 at SLAC(?) • Are slim magnets needed? Magnet people waiting for answer (may take another year before the dust will settle) • Important: reliable(!) beam-beam simulations/predictions • B-B-wires construction is over, studies started: • Some funds can be redirected into (similar) new initiative(s) LARP Collaboration Meeting

  14. New Initiatives (list) • Collider Instrumentation • BBQ-based Quadrupole Monitor • Synch light based diagnostics • Physics • LHC Crystal Collimation Scheme • LHC Electron Lenses • Modeling of LLRF Limitations on LHC Performance • Crab Cavities • LHC Injectors • The Low-Energy Transverse Emittance Project • Super-Ferric Fast Cycling Injector in the SPS Tunnel • LHC injectors Upgrades, space-charge effects LARP Collaboration Meeting

  15. QMM-based e measurement (P.Cameron et al) monopole (sum) (L+R+U+D) dipole (difference) (L-R) / (L+R) (U-D) / (U+D) quadrupole m = (L+R)-(U+D) / (L+R+U+D) = sx2 - sy2 + x2 – y2 for x=y=0 (and dispersion ~ 0) m = exbx –eyby given the b functions, we have one equation with 2 unknowns use two locations/pickups (with differing b functions!) LARP Collaboration Meeting

  16. Quadrupole Moment Monitor • Novel developments combined : • Employ BBQ with its hude dynamics range • Use Quadrupole Transfer Function (ATF) method • Excite at 2xf_betatron and observe emittances on ramp • Complement SyncLite and IPMs • Could be tested in RHIC • Requested 0.3FTE support and little (15k$) M&S funds LARP Collaboration Meeting

  17. Electro-optic modulator InGaAs PD Fiberoptic Fiberoptic Fiberoptic coupler/lens Fast pulser 50 ps @ 40 MHz PC Data acquisition board (ADC) Longitudinal Density Monitor(S.DeSantis et al) • Couple SyncLite to optical fiber, deliver signal upstairs and process it there with electro-optical modulator LARP Collaboration Meeting

  18. LDM • Encouraging tests at the ALS: • -5dB coupling • Of interest for the LHC: • There is transverse SyncLite diagnostics • Longitudinal diagnostics = Resistive Wall Monitor • LDM promises 25-50 ps slice diagnostics tails and abort gap dynamics, etc – phenomena of importance for operations • Smth like LDM is in LHC Phase II “wish list” LARP Collaboration Meeting

  19. LLRF Modeling (J.Fox) • Bring PEP-II experinece in the LHC RF optimization • Nonlinear implementations of klystron, RF amplifiers, filters and FB loop optimizations, etc • Optimization and participation in commissioning LARP Collaboration Meeting

  20. Electro-optic modulator InGaAs PD Fiberoptic Fiberoptic Fiberoptic coupler/lens Fast pulser 50 ps @ 40 MHz PC Data acquisition board (ADC) Longitudinal Density Monitor(S.DeSantis et al) • Couple SyncLite to optical fiber, deliver signal upstairs and process it there with electro-optical modulator LARP Collaboration Meeting

  21. Crab Cavities: KEK-B 22mrad • Successful Operation: • 10’s% for KEK • Stable enough for LHC LARP Collaboration Meeting

  22. Crab Cavities for LHC • Some 10-100% luminosity gain (beta*=25cm10cm) • Phase I: • Realistic simulations for emittances and RF curvature • Prototype 800Mhz cavity (2 cell) - ? • Small crossing angle consideration 400 urad • 10-15MV 2x2 cell cavity • Scale ~3.7M$ • Can get a lot of knowledge/input/help from KEK and US labs • KEK is interested in LHC crab cavities (postdoc coming to CERN) • Synergy possible with ILC crab-cavity • “Moderately difficult, large benefit!” (R.Calaga) LARP Collaboration Meeting

  23. Two-Stage Collimation: Crystal as Primary Courtesy R. Assmann LARP Collaboration Meeting

  24. Crystal Collimator • Two plane proton collimation system test at Tevatron in FY08-09 (68 hrs of study time) • SLAC-BNL-FNAL • CERN-INFN-IHEP-Gatchina • CERN supportive (endorsed by R.Assmann) • Italy can deliver 2nd goniometer (vert) • Long list of studies • Deliverables: • Demonstration of predicated background reduction in Tevatron (better than W primaries) • Answer operation-related questins (volume reflection vs channeling, radiation effects on crystals, etc.) LARP Collaboration Meeting

  25. LHC Electron Lenses Tevatron Electron-Lenses demonstrated Beam-beam compensation 1.2A DC e-beam can compensate head-on tune spread in LHC LARP Collaboration Meeting

  26. LHC Electron Lens(es) Proposal • BNL-FNAL-SLAC and CERN • Of highest priority: explore feasibility of head-on beam-beam compensation • Proposed 5 yr plan: explain TEV results  simulate BBC for RHIC and LHC  build and test RHIC EL  proceed with LEL • LARP plays role at initial stage (modeling , simulations 1.5-2 FTE postdoc) • Construction to be supported from different funds: • REL – by BNL • LEL - by IRUP or CERN or both • Other uses to be considered in detail: • Hollow beam collimator (Vladimir and Ralph) • Short-”long-range” compensation (Jean-Pierre) • Pulsed beam bunch-by-bunch compensation (JPK and Vladimir) LARP Collaboration Meeting

  27. Low Energy Transverse Emittance Project (D.Moehs) Propose to build a “standard candle” At 50-100kV emittance measurement is not simple! But very important… LARP Collaboration Meeting

  28. LETEP • A lot of interest from CERN (new 3MeV test facility) • LBNL and FNAL can design and build the monitor • 1.7FTE and ~50k$ in FY08 (+09?) • Proposed plan: • Design • Build • Test and compare at FNAL (with 2 other monitors) • Test at CERN 3MeV facility • Build another one to test at other labs/facilities in US LARP Collaboration Meeting

  29. SuperFerric Magnets for LHC Injectors Can help not only collider but Neutrino program as well (2 sec cycle) SPS upgrade – for 300M$! LARP Collaboration Meeting

  30. SuperFerric Magnets for LHC Injectors Can help not only collider but Neutrino program as well (2 sec cycle) SPS upgrade – for 300M$! (H.Piekarz)…. Not from LARP funds !! LARP Collaboration Meeting

  31. Space-Charge Effects for LHC Injectors Upgrages • FNAL (M.Popovic, et al) and CERN • Benchmark ORBIT code and simulate SC effects in all relevant machines in the LHC injector chain • Experiments in FNAL Booster (400MeV), CERN Booster (50 MeV and 160 MeV) • Results to be reported in reports, ORBIT modifications may follow LARP Collaboration Meeting

  32. Summary: • Very efficient Collaboration meeting: • Many open friendly discussions, “like workshop” • Thanks to: • L2 task leaders for organizing working sessions • People presented new proposals, reported progress • LTV advisory committee delivered what was asked • Our CERN colleagues for coming and playing important role in discussions and help in setting directions for the next year(s) LARP Collaboration Meeting