An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Whisper 200 Analysis and Remediation Phase V Presentation Group 7 Thomas Kudej Marko Sutovic Timothy Smith

  2. Group Members Advisor Professor Basu Thomas Kudej Timothy Smith Marko Sutovic

  3. Presentation Outline • Project Objective • Design Specifications • Comments • Phase V • Monitoring System • Assembly • Programming • Improved Foundation • Issues • Schedule of Deliverables • Updated Budget • Gantt Chart • Nugget Chart • Project e-poster • Conclusion • Questions?

  4. Project Objectives • To design a monitoring system to record data from the wind turbine and use this data to improve on the power generation . • Design and build a foundation to raise the height of the turbine over any obstacles and bring it closer to the recommended height. • Use the monitoring system to observe turbine performance including vibrations transmitted by the turbine into the roof slab. • Modify foundation in response to vibrations analysis • Analyze the data to study trends of a wind turbine in an urban environment

  5. Design Specifications • Purpose – Increase and monitor performance of Whisper 200 • Functional characteristics – Monitor energy production with relation to local wind speed, Monitor vibrations transmitted in relation to power generation, Display live video feed. • Safety- Able to withstand high velocity wind • User requirement - Use gathered data to study wind turbines in an urban environment and how to improve them

  6. Comments • Received comment of no clear definition of what final project scope is. • Address it by redefining project into improving wind turbine performance through increased height and developing monitoring station to study performance. • Through the use of monitoring station, the wind turbine will become a tool of study of wind energy in an urban environment. • Such information can be used to further develop new solutions to improve energy generation.

  7. Monitoring System • Live remote monitoring • Vibration • Power production • Wind behavior • Video feed • Store data to create archive of Whisper 200 performance characteristics • Post results on website

  8. Monitoring System • Parts Ordered • 2 Accelerometers • USB data logger • USB to Ethernet Micro server • Programming • Labview • Sensors signal processing • Website • Easy display of data • Live video feed

  9. Monitoring System-Progress • All components ordered and received • Programming currently underway. • Interfacing all components to USB data logger • Housing material purchased but not assembled yet. Working station needs to be completed before encasing it • Issue with Internet micro server connecting to network-Working with Computer Service Center • Issue with data logger in recording turbine voltage output- Limit to maximum 12V-Designing circuit to reduce load to acceptable means.

  10. Monitoring System-Looking ahead • Resolve current issues • Finish program and debug • Install system on Whisper 200 • Begin data acquisition and publish information to website

  11. Improved Foundation • Objective • Foundation Design • Solidworks Model • Engineering Drawings • Fabrication • Materials • Assembly

  12. Objective • Height of the wind turbine was 9.6 Feet(Base to center of turbine) • Manufacturer states that the Whisper 200 should be placed 20 ft above trees or obstacles within 300ft. • Goal: Increase the height of the structure to capture higher wind velocity and increase voltage output.

  13. Model

  14. Engineering Drawing

  15. Structural Analysis

  16. Fabrication - Materials • Foundation parts purchased and received • (1) – 48’’ Triangular Plate • (1) – 24’’ Triangular Plate • (3) – 2’’ Diameter Schedule 40 Pipe (1/4’’ Thick) • (2) – 5 ft Angle Line (1’’ Thick) • (2) – 6 ft Steel Straight Channel

  17. Foundation Progress • Main structure welded together and completed • H frame support installed • Looking Ahead: • Weld support truss to give greater stability • Weld current tower unto the new foundation and set it on the H frame • Install guy-wires

  18. Assembly

  19. Schedule of Deliverables

  20. Updated Budget

  21. Updated Gantt Chart

  22. ME 424 Phase V Nugget Chart– Prototyping & Performance Testing Title: Whisper 200 Analysis and RemediationTeam Members: Thomas Kudej, Marko Sutovic, Timothy SmithAdvisor:Dr. Basu and Dr. Prasad Project #: 7 Date:3/25/10

  23. E-Poster

  24. Conclusion • Currently on schedule. • Final objectives have been formulated • Steps required to achieve objectives are defined and allotted enough time for completion