1 / 59

EU AID FUNDS PROFITED BY TARNOBRZEG

EU AID FUNDS PROFITED BY TARNOBRZEG. POLAND AND EU FUNDS.

kamal-huff
Download Presentation

EU AID FUNDS PROFITED BY TARNOBRZEG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EU AID FUNDS PROFITED BY TARNOBRZEG

  2. POLAND AND EU FUNDS Banska Bystrica, March 2004

  3. National Development Plan (NDP) for 2004-2006 decreeted by Ministry Council on 14 January 2003 as a basic strategic document which marked basic aims and tasks of state socio-economic progress using available structural and cohesion funds. The integral part of NDP is constituted by operational programmes where those tasks are defined. • The strategic aim of National Development Plan is to develop a competitive economy founded on knowledge and entrepreneurship capable of long-term, harmonized progress, that ensures the growth of employment and improvement of social, economic and space cohesion with EU on regional and state level. Total EU aid sum planed in that document shall amount to about 11.4 billion € Poland and EU funds Programme documents in Poland

  4. Poland and EU funds According to the proposal concluded in National Development Plan, European structural means will be disbursed in our country in the frame of: • Sectoral Operational Programme (SOP), • Integrated Regional Operational Development Programme (IRODP), • Strategy of Cohesion Fund Profits (SCFP), • Operational Programmes for Community Initiatives (OPCI). Banska Bystrica, March 2004

  5. SOP Growth of economy competitiveness – 17.8 % of the total sum (1300 mln €), • SOP Development of human resources – 17.3 % of the total sum (1270.4 mln €), • SOP Readjustment and modernization of food sector and development of rural areas – 14.4 of the total sum (1005.5 mln €), • SOP Fishery and fish processing – 2.4 % of the total sum (176.6 mln €), • SOP Transport – Sea Economy – 8.6 of the total sum (627.2 mln €), • IRODP – 39.2 % of the total sum (2859.5 mln €), • TA – Technical assistance – 0.3 % of the total sum (20 mln €). Total sum of 4.1 % (314.6 mln €) of all Structural Funds was foreseen for realization of Community Initiatives programmes. Poland and EU funds Sectoral Programmes: Banska Bystrica, March 2004

  6. Poland and EU funds In 2004-2006 two initiatives will be carried out inPoland: • EQUAL – serves trans-national cooperation in the domain of new ways of overcoming any kinds of discrimination connected to the labour market, • INTERREG – serves trans-board, trans-national and trans-regional cooperation intending to harmonize space managemen. During the implementation of NDP 3733.3 mln € will be covered byCohesion Fund, where 50 % of above sum will be spent on transport projects and environment infrastructure projects. Banska Bystrica, March 2004

  7. Poland and EU funds INTEGRATED REGIONAL OPERATIONAL DEVELOPMENT PROGRAMME Integrated Regional Operational Development Programme (IRODP) is one of the seven operational programmes which would serve to fulfill NDP. The programme develops NDP aims defining priorities, directions and amount of means designated for the realization of state regional policy and will be set up with structural funds aids in the beginning of Poland membership in EU.

  8. Poland and EU funds In 2004-2006 to carry out Integrated Regional Operational Development Programme (IRODP) 4385.2 mln € will be engaged where 2869.5 mln €will be covered by Structural Funds(ERDF,ESF).Integrated Regional Operational Development Programme is the closest one to the town`s local governments. It offers the best possibilities in co-financing local development projects, increasing social, economic and territory cohesion and integration with EU.

  9. TARNOBRZEG TOWN CHARACTERISTICS Banska Bystrica, March 2004

  10. TARNOBRZEG IN EUROPE Town area: sq km 86Population: 50 300 Banska Bystrica, March 2004

  11. Tarnobrzeg town characteristics HISTORY Tarnobrzeg was founded in 1593 by a privilege granted by King Sigismund III Vasa to the Tarnowski family. Since 1772, after first partition of Poland, Tarnobrzeg fell into Austrian hands.

  12. Tarnobrzeg town characteristics In 1855 the town became the capital of the district, and in 1867 – the starosty. Those events had a positive impact on town development - telegraph line, a railway, a hospital, elementary school and a printing house have been built. In 1909 Imperial- Royal High School was created and then converted into State Gymnasium the hetman Tarnowski name. Banska Bystrica, March 2004

  13. Tarnobrzeg town characteristics In the thirties the town faced a new development perspectives owing to so called Central Industrial District. After the Second World War Tarnobrzeg found itself within the borders of the Rzeszów Province as the capital of the district. Banska Bystrica, March 2004

  14. Tarnobrzeg town characteristics The stagnation period was ended when large sulphur deposits were discovered in themid-fifties. Tarnobrzeghas become the main center of Polish sulphur industry. An open pit sulphur mine in Machów

  15. Tarnobrzeg town characteristics In 1975 as a result of another reorganization of administration structure, Tarnobrzeg has become the capital of a province. Banska Bystrica, March 2004 Mayor residence

  16. In the nineties business condition on the world sulphur market has changed (mined brimstone gave up the way to the sulphur produced during the process of oil an gas desulphurisation). It gradually caused the decline of the mines and sulphur processing plants. • In 1999 Tarnobrzeg became the part of Subcarpathian Province as the capital of an urban district. Tarnobrzeg town characteristics Banska Bystrica, March 2004

  17. Tarnobrzeg town characteristics Banska Bystrica, March 2004

  18. Tarnobrzeg town characteristics Banska Bystrica, March 2004

  19. Population on the whole – 50 300 (est.2003) Men – 24 257 Women –26 043 People in pre-production age People in production age People in post-production age Tarnobrzeg town characteristics Population ofTarnobrzeg Banska Bystrica, March 2004

  20. Tarnobrzeg town characteristics ECONOMY Since 1989 small and medium-sized private companies have been open at a fast rate, mainly in retailing, services and manufacturing, becoming an important addition to large companies, dominant so far.

  21. The number of businesses on the whole – 4967 (2003 rok) Industry Architecture Commerce and repairs Hotels and restaurants Transport, warehouse and communication Finance agency Real estates and companies service Health and social care Education Agriculture Tarnobrzeg town characteristics THE NUMBER OF BUSINESSES BY CHOSEN KINDS OF ACTIVITY Banska Bystrica, March 2004

  22. Total number of employees 11 559 (2002) Industry Architecture Commerce and repairs Transport, warehouse and communication Finance agency Real estates and companies service Health and social care Public administration and defence; compulsory social security Education Tarnobrzeg town characteristics Labour market by branches Banska Bystrica, March 2004

  23. House of block construction is undertaken in the frame of - initiated (in 2000) by local authorities - Tarnobrzeg Society of Social Architecture (TSSA). The aim of the Society is to build the flats for rent for mid-income persons. • Up till now the part of the investor was played by housing co-operatives, but for several years they have not carried out any investment. Right now the only investor in that branch is the town via TSSA. • In July 2001 the construction of the first building was started. Till 2003 three block of flats were built. Considering the big concern with that way of architecture, the construction of another buildings is planned. To fulfill that aim the town granted a land and 200000 € from town issued bonds. Tarnobrzeg town characteristics BUILDING OF APARTMENT HOUSES Banska Bystrica, March 2004

  24. Tarnobrzeg town characteristics The house of flats built in 2002

  25. The number of flats by the end of 2003 – 15 447 Tarnobrzeg Housing Co-operative Housing Co-operative „Siarkowiec” Plant Architecture Others Town resource Tarnobrzeg town characteristics Tarnobrzeg flat resources structure Banska Bystrica, March 2004

  26. Tarnobrzeg town characteristics The town has got his own Strategy of Development Banska Bystrica, March 2004

  27. Tarnobrzeg town characteristics THE INSTITUTIONS SUPPORTED LOCAL SELFGOVERNMENT • The Tarnobrzeg Industry Development Agency (a joint stock company) – established in 1993, • The Tarnobrzeg Capital Center (a joint sock company) – the institution creating the TSEZ est. in 1997, • The Tarnobrzeg Special Economics Zone –Euro-Park “Wisłosan”, sub-zone Machów est. in 1997, Banska Bystrica, March 2004

  28. Tarnobrzeg town characteristics THE INSTITUTIONS SUPPORTED LOCAL SELFGOVERNMENT • The Tarnobrzeg Branch of Industry Development Agency (a join stock company) – the manager of TSEZ since 1999, • Business Incubator in Tarnobrzeg – created in 1999, • Center for Information and Planning the Professional Activity – created in 2000. Banska Bystrica, March 2004

  29. Tarnobrzeg town characteristics THE INSTITUTIONS SUPPORTED LOCAL SELFGOVERNMENT • The Tarnobrzeg State Professional College; created in 2001, teaches: • - entrepreneurship and management, • - pedagogy, • In 2003 a serious efforts has been made to create the Guarantee Fund. Banska Bystrica, March 2004

  30. Tarnobrzeg town characteristics TOWN ENTITIES • Municipal Company, • Waste Treatment Company, • District Heating Company, • Municipal Television Banska Bystrica, March 2004

  31. The Tarnobrzeg Special Economics Zone Europark-Wisłosan was created in 1997 for 20 years. • The Mission: The develop post-industrial land previously used for sulphur, machine, metal and defense industry. Could be done by promoting new activities and spare energy lines and resources. • Strategic Aims: - Creation of 12 thousand jobs in the zone and in its surroundings - Thriving vacant estates and buildings • Sub-zone Tarnobrzeg: Up till now E 5 mln has been invested in Tarnobrzeg and has created 350 new jobs. There are 5 new investors in the sub-zone. Tarnobrzeg sub-zone covers 180.8 ha Tarnobrzeg town characteristics THE TARNOBRZEG SPECIAL ECONOMICS ZONE Banska Bystrica, March 2004

  32. Tarnobrzeg town characteristics THE TARNOBRZEG SPECIAL ECONOMICS ZONE Banska Bystrica, March 2004

  33. In place of former sulphur mine a large recreational lake (455 ha) is being constructed. The construction is a part of the pro-ecological project which aimed to create new perspectives for devastated land. • The plans presumed new beaches, lakeside resorts, parking places and restaurants. • The lake construction will create a great opportunity for Tarnobrzeg, it shortly will overturn into a tourist center Tarnobrzeg town characteristics THE CONSTRUCTION OF RECREATION BASIN IN POST-INDUSTRIAL AREA Banska Bystrica, March 2004

  34. Tarnobrzeg town characteristics The artificial lake construction Banska Bystrica, March 2004

  35. Tarnobrzeg town characteristics Banska Bystrica, March 2004 The plan of thriving the lake and nearby land

  36. Tarnobrzeg town characteristics INVESTMENT OFFER The key investment land of Tarnobrzeg The town offers the potentialinvestors attractive possibilities. We have got vacant terrains raging from 0.1 ha to 10 ha. near the center of the town and spare land for commerce and service in the middle of the town. Banska Bystrica, March 2004

  37. Tarnobrzeg town characteristics The pre-accession and structural UE funds are the special interest of Town Office Department of Development, Promotion and Aid Programmes The Department co-works with: • Government administration (on the state level), • Voivodship and region self- government (on regional level), • Poviat Labour Office, Agency of Regional Development, Businessmen and associations and so on. Banska Bystrica, March 2004

  38. Tarnobrzeg town characteristics The Department also runs the official town website :www.tarnobrzeg.pl Banska Bystrica, March 2004

  39. PRE-ACCESSION AND STRUCTURAL FUNDS IN TARNOBRZEG Banska Bystrica, March 2004

  40. Fundusze przedakcesyjne i strukturalne w Tarnobrzegu 1. THE PROJECTS CARRIED OUT WITH PRE-ACCESSION FUNDS Banska Bystrica, March 2004

  41. Fundusze przedakcesyjne i strukturalne w Tarnobrzegu IMPROVEMENT OF TOWN INVESTMENT ATTRACTIVENESS BY MODERNIZATION THE MAIN ROAD (VOIVODSHIP ROAD NO 723) WITHIN THE FRAMEWORK OF THE STRATEGIC PLAN FOR IMPROVEMENT TRANSIT TRAFFIC FLOW IN TARNOBRZEGPHARE ‘99 Project scope: The modernization of the part of voivodship road No 723 by building kerbs, pavements, bicycle routes, modernization of road surface and building rainwater drainage system. Project aim: Improvement the traffic and increase pedestrian safety. The term of the implementation: 2000-2001 The project value: 265 646 € ( PHARE endowment 111 213 €) Banska Bystrica, March 2004

  42. Fundusze przedakcesyjne i strukturalne w Tarnobrzegu TRANS-BOUNDARY BUSINESS ACTIVITIES FOR SME SECTOR Project scope: Arrange business partners from Poland and Ukraine and training export and trans-boundary co-operation. The project covered Poland and Ukraine terrains belonged to the Bug Euroregion. Results: As a result of the project the business exchange had been done. Tarnobrzeg hosted 20 businessmen from Ukraine who attended local fairs. The term of the implementation: 1998-1999 The project value: 13 000€ The project carried out with the Bug Euroregion Endowment and with PHARE assist. The project carried out by Tarnobrzeg Agency for Regional Development. Banska Bystrica, March 2004

  43. Fundusze przedakcesyjne i strukturalne w Tarnobrzegu TARNOBRZEG BUSINESS INCUBATOR The project scope: The project started up the business incubator for those who want start their own business activity, for unemployed and for SME. The project covered a wide range of training and consulting for SME. Results: Up till now 30 companies benefited the project, and additional 12 run their business. The term of the implementation: since 1999 The project value: 30 000 €(PHARE endowment 24 000€) The project carried out by Tarnobrzeg Agency for Regional Development Banska Bystrica, March 2004

  44. Fundusze przedakcesyjne i strukturalne w Tarnobrzegu THE CONSULTING STATION FOR SME The Project Scope: Wide range of consulting service associated with SME working under free-market economy condition. The project is benefited by the persons who start their own business and SME. The project covers north-western region of Podkarpackie Voivodship. Results: Up till now 50 companies benefited the project, and 370 unemployed The term of the implementation: since 2001 The project value:10 300 € (PHARE endowment 8 000 €) The project carried out by Tarnobrzeg Agency for Regional Development with town assist. Banska Bystrica, March 2004

  45. Fundusze przedakcesyjne i strukturalne w Tarnobrzegu INFORMATION CAMPAIGN ON EUROPEAN UNIONCO- WORKING FUND Project Scope: To put in force the information campaign on European Union and Poland Accession. During the three day action the town organized meetings, contests and other activities promoting UE access. The term of the implementation:May 2003 The project value: 2 000 € (Co-working Fund contribution: 1000 €) Banska Bystrica, March 2004

  46. Pre-accession and structural fund in Tarnobrzeg 2. THE PROJECTS IN THE PREPARING STAGE TO BE IMPLEMENT BETWEEN 2004 - 2006 Banska Bystrica, March 2004

  47. Pre-accession and structural fund in Tarnobrzeg INCREASING THE INVESTMENT ATTRACTIVENESS OF THE TARNOBRZEG AREA TO THE SME SECTOR –PHARE 2003 Project scope: • The completion of the sewerage network of total length 10 km, • The modernization of the road surface of a 6 km, • The modernization of the slip road of total length 2 km , • The laying of 9 km pavement , • The modernization of a junction. • The aim of the project: • Create favorable conditions for correct work and growth the SME sector, • To ensure the proper sewerage network and increase the road access for the vacant investment terrain , • To increase the competitiveness of existing SME . The term of the implementation:2004-2005 The project value:3.58 mln € ( PHARE endowment 2.25 mln €) Banska Bystrica, March 2004

  48. Pre-accession and structural fund in Tarnobrzeg PROVISION OF WATER SUPPLY AND SEWAGE REMOVAL INFRASTRUCTURE– COHESION FUND The project scope: • The construction of sanitary sewerage network of total length 120 km, • The construction of rain sewerage network, • The development of sewage treatment facility (the new technologies of sewage treatment and after treatment removals), • The modernization of existing water-supply network, • The computer controlled water- supply • The project aims: • Protection of soil and water, • The rain treatment meeting the rules of the European law, • The protection of artificial lake in Machów against contaminated water, • The liquidation of illegal drainings, • The improvement of fresh water quality. • The term of the implementation:2005-2009 • The project value:11,7 mln € (UE endowment: 8,2 mln €) Banska Bystrica, March 2004

  49. Pre-accession and structural fund in Tarnobrzeg CRESCENDO - COST EFFECTIVE RENEWABLE ENERGY SYSTEMS FOR COMMUNITIES AND ENERGY DEMAND OPTIMISATIONTHE SIXTH CONCERTO PROGRAMME The project scope: • The creation of the cocal energetic willow culture as a basis for energy renewal production, • Implementing of producer – consumer energy management. Project aims: • CO2 reduction as a result of biomass burning and reduction of consumers demand, • The reduction of energy expenses by the modernization of energy source and distribution system, • The growth oh local awareness of balanced growth programmes. The term of implementation: The CRESCENDO Project will be carry on within 60 month beginning from January 2005 The project value:3 317 400 € (UE endowment35% - 1 161 000 €). Banska Bystrica, March 2004

  50. Fundusze przedakcesyjne i strukturalne w Tarnobrzegu 3. Example of the projects applied to Structural Funds by Tarnobrzegin 2004-2006– The estimation of the project will be taken by experts in May 2004 Banska Bystrica, March 2004

More Related