1 / 4

F ormer T enneco S tation S tarke, F lorida

F ormer T enneco S tation S tarke, F lorida. Client: Enviro-Logical Solutions, Inc. Tampa, Florida Office eGeo mobilized a PHOSter II™ unit in January 2001 at this former gas station site. For the first time, eGeo utilized existing air sparging injection wells (see IP-1 through IP-6).

kamala
Download Presentation

F ormer T enneco S tation S tarke, F lorida

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Former Tenneco StationStarke, Florida • Client: Enviro-Logical Solutions, Inc.Tampa, Florida Office • eGeo mobilized a PHOSter II™ unit in January 2001 at this former gas station site. • For the first time, eGeo utilized existing air sparging injection wells (see IP-1 through IP-6)

  2. Former Tenneco StationStarke, Florida • The corrective action remediation cleanup site reached Florida target levels for BTEX and Naphthalene in August 2002. • After 4-quarter post-remediation monitoring period, site received “No Further Action” letter from DEP in 2004.

  3. Former Tenneco Site.,MW-6HistoricalBenzeneConcentrations Benzene, ppb

  4. Former Tenneco Site.,MW-6Historical Naphthalene Conc. Naphthalene, ppb

More Related