220 likes | 359 Views
SAN DIEGO COLLEGE. Campus Construction Projects. August 21, 2008. Completed Construction Projects. LRC “Down Under” Classrooms ModVille Military Education Mods. Projects Under Development. Academic Success Center P Building Renovation Career Technology Center
E N D
SAN DIEGO COLLEGE Campus Construction Projects August 21, 2008
Completed Construction Projects • LRC “Down Under” Classrooms • ModVille • Military Education Mods
Projects Under Development • Academic Success Center • P Building Renovation • Career Technology Center • Arts & Humanities Building • Business Technology Building • Sciences Building • General Purpose Classroom Building • Central Plant Expansion • Property Acquisition
SAN DIEGO COLLEGE 16th Street Precise Plan August 21, 2008
Campus Master Plan 2005 “A Unified Campus” • Embrace & Enhance a • Collegial Environment • Attractive, Diverse Outdoor Spaces • Welcoming Campus Gateways • Symbolic Presence & Strong Identity • Link Campus Areas Park Blvd 16th Street Russ Street A Street B Street B Street C Street C Street Park Blvd. 13th Street 15th Street 14th Street 16th Street 17th Street Existing Buildings Broadway Broadway
Campus Master Plan 2005 • Campus for 25,000 students • Academic Neighborhoods • Integrated Parking • Consideration for • Topography & Landscape • Consideration for • Safety and Accessibility • Multi-Story Campus Buildings • Phased Growth Plan Park Blvd 16th Street Russ Street A Street B Street B Street C Street C Street Park Blvd. 13th Street 16th Street 14th Street 15th Street 17th Street Existing Buildings Broadway Broadway
Neighborhood Connections 2005 Academic Neighborhoods • Neighborhood • Centers • Way-finding/ • Accessibility • Activate Internal & • Peripheral Pathways • Access Points & • Community Connection • Expansion & Growth • Strategy Park Blvd 16th Street Russ Street A Street B Street B Street C Street C Street Park Blvd. 13th Street 15th Street 14th Street 16th Street 17th Street Broadway Broadway
Campus Master Plan 2005 Campus Environment Strategy • Pedestrian Pathways • Major Gathering Places • Secondary Courtyards • & Gardens • Landscape • Lighting & Signage • Safety and Accessibility • Architectural Character Park Blvd 16th Street Park Boulevard Green B Street C Street Enhanced Crosswalk Broadway
B Street 2005 Facilities Master Plan Coordinate Approved Bond Funded Projects Incorporate Infrastructure & Parking Needs Outline a Comprehensive Development Area Park Blvd 16th Street B Street 16th Street Precise Plan Study Area C Street Broadway SAN DIEGO COLLEGE
B Street 2008 Facilities Master Plan Update Validate Academic Program Needs Establish Building Sizes & Locations Strategize Topography & Accessibility Outline a Comprehensive Construction Plan Park Blvd 16th Street B Street 16th Street Precise Plan Study Area C Street Broadway SAN DIEGO COLLEGE
B Street 16th Street Precise Plan Study Area T Building A Building • academic buildings • 6 new facilities • 2 modified buildings • open space network • structured parking • 6 locations • 2,050 spaces • topography & • accessibility L Building B Street C Building C Street 16th Street Broadway SAN DIEGO COLLEGE
B Street Academic Programs A Building 5b 1 Career Technology Center 2 Child Development Center 3General Purpose Classroom Building 4aArts & Humanities 4bBusiness Technology 5aSciences 5bEngineering Technology (renovated T Building) 5a L Building B Street 4b C Building 2 4a C Street B Street 3 1 16th Street Broadway SAN DIEGO COLLEGE
B Street Master Plan Design Principles A Building create a campus “outdoor space” network L Building B Street C Building create campus gateway experiences C Street B Street respect the city’s urban street edges 16th Street Broadway SAN DIEGO COLLEGE
B Street Pedestrian Circulation A Building “on-grade” pedestrian paths of travel L Building planned elevator circulation B Street C Building planned bridge connection C Street B Street 16th Street Broadway SAN DIEGO COLLEGE
B Street B Street Vehicular Circulation B Street A Building existing street system L Building parking access B Street C Building C Street B Street 16th Street Broadway SAN DIEGO COLLEGE
B Street Buildings & Landscape P P 5b A Building 1 Career Technology Center 2 Child Development Center 3General Purpose Classroom Building 4aArts & Humanities 4bBusiness Technology 5aSciences 5bEngineering Technology P Parking 5a L Building B Street 4b P C Building 2 4a P C Street P P 3 1 16th Street Broadway SAN DIEGO COLLEGE
Sciences & Engineering Technology Russ Boulevard Parking A Building Engineering Technology Sciences Building Key Map L Building 16th Street B Street SAN DIEGO COLLEGE
Arts/Humanities & Business Technology B Street Business Technology C Building Key Map Saville Theatre 16th Street Arts & Humanities C Street SAN DIEGO COLLEGE
Career Technology, General Classroom & Child Development Parking Child Development Center C Street Key Map Parking Parking Career Technology Center General Purpose Classrooms 16th Street 17th Street Broadway SAN DIEGO COLLEGE
B Street 16th Street Precise Plan: “A Unified Campus” • Great Collegial Environments • Linked Campus Areas • Academic Neighborhoods • Integrated Parking • Consideration for • Topography & Landscape • Consideration for • Safety and Accessibility • Phased Growth Plan B Street C Street 16th Street Broadway SAN DIEGO COLLEGE