Duchesne Oilfield Dumping Incident www.epaosc.org/duchesneoilfielddumping. Duchesne, UT September 24 – October 6, 2010 NRC Report 955263 FPN E10814. Key Response Issues. Notification procedures and use of the NRC Knowledge and use of the Green River sACP

kane-burton
Download Presentation

Duchesne Oilfield Dumping Incident epaosc/duchesneoilfielddumping

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Duchesne Oilfield Dumping Incidentwww.epaosc.org/duchesneoilfielddumping Duchesne, UT September 24 – October 6, 2010 NRC Report 955263 FPN E10814

  2. Key Response Issues • Notification procedures and use of the NRC • Knowledge and use of the Green River sACP • Changing Oil Spill Response Organization (OSRO) tactics and priorities to fit response • Pollution Reimbursement Funding Authorization (PRFA) to “save” Duchesne County complicated • Balancing needs of the response with the “rights” of water users downstream • Protecting T&E species and maintaining flows

  3. To Upper Stillwater Reservoir (35 Miles) Starvation Reservoir To Green River (44 Miles) Impacted Areas: Strawberry ~ 1 mile Duchesne ~ 3 miles Duchesne River 25 CFS Strawberry River 135 CFS

  4. Spill Discovery • Discovered by local resident on recreation path • Nearby water filling station for oil production • Duchesne County (DC) FD and Emergency Management notified on 9/24/2010 at 1:30 PM • DC Emergency Manager (EM) notified UDEQ and was given a list of OSROs to contact for support • DC EM ordered OSRO to mobilize and respond under verbal contract • UDEQ, TriCounty Health Department, & Ute Tribe representatives on-scene to size-up incident • DC Sheriff finds evidence of “midnight dumping” of “up to 80bbls of produced water and oil” at ramp

  5. Initial Response & OSRO Escalation • Friday, 9/24/10 – Flow Reduction, Booming • 5 OSRO Personnel, Vacuum Truck, 250’ Boom • $7,500 Response Costs • Saturday, 9/25/10 – Access Points, Booming • 12 OSRO Personnel, 2 Vacuum Trucks, 2 Roll-Offs, 2,000’ Boom • $24,000 Response Costs / $31,500 Cumulative Costs • Sunday, 9/26/10 – Booming & Vacuuming • 13/16 OSRO/Sub Personnel, 2 Vac Trucks, Frac Tank, Excavator, Skid Steer, 2 Roll-Offs, 2,000’ Boom • $32,500 Response Costs / $64,000 Cumulative Costs • Monday, 9/27/10 – Vacuuming & Gross Oil Recovery • 13/32 OSRO/Sub Personnel, 2 Vac Trucks, 2 Frac Tanks, Excavator, Skid Steer, 2 ATVs, 2 Roll-Offs, 2,000’ Boom • $46,000 Response Costs / $110,000 Cumulative Costs • As of 5:00 PM on 9/27/2010: • - No estimate of recovered oil • - 2,000 gal of “oily water” recovered • - 15 bags of crude/oiled substrate recovered • Estimated 4-6 weeks to complete removal • to Red Butte Creek Oil Spill standards

  6. Notification to EPA • UDEQ eMail to EPA Region 8 RRC • Saturday, 9/25/2010 @ 9:26 AM • “Debris, including petroleum products,” • “dumped [from truck] into [Strawberry River],” • “staying in clumps and not [mobile],” • “although booms placed to contain the spill.” • TCHD call to National Response Center • Monday, 9/27/2010 @ 2:30 PM • “~20 bbls of crude oil dumped into Strawberry River” • “impacting 4 mi of Strawberry and Duchesne Rivers” • “OSRO on-scene, but EPA help/resources needed.” • EPA OSC Dispatched to Incident @ 3:05 PM

  7. EPA Initial Response Actions • Initial assessment of impacted river segments confirmed impacted areas and oil properties • Convened UC meeting and worked to prioritize/right-size OSRO oil recovery efforts • Consulted with DOI regarding T&E implications of reduced flows in Duchesne River • Met with BIA and Ute Tribe about their concerns • Considered mobilizing ERRS contractor to subcontract with OSROs • Instead initiated discussions with the NPFC about issuing a PRFA with DC to fund response • Stopped short of “ratification” for initial costs

  8. Removal Effort • Involved primarily physical/mechanical collection of clumps of oil and oiled substrate by crews • Focused on working from impacted Duchesne River toward spill site to expedite restoring flows • Extensive SCAT effort along impacted areas by UDEQ, DC, TCHD, EPA and Ute Tribe • Worked closely with Central Utah Water Conservancy District to “flush” rivers • Recovered ~10-12 bbls of crude oil during 10 days of response, which cost almost $500k • DC still negotiating contract/invoice with OSRO

  9. 30 CFS 300 CFS

  10. Lessons Learned & Recommendations • Utilize NRC as “one call” phone number for Oil and HazMat spills; legally enforce compliance • Cleaning up spills is our business; developing novel contracting mechanisms isn’t • Discourage independent initiative and educate EMs about the inherent liability in spill response that is inconsistent with the NCP • Conduct outreach in oil production areas, emphasizing costs/benefits of compliance • Reinvigorate sACP updating and exercises in all nine Region 8 sACPs, beginning with Green River, Colorado River, and Missouri River

  11. Google Earth File

  12. “Thank you for your support!” Questions? Criticism? Outreach Ideas? General Harassment? Contact me… Steven Merritt On-Scene Coordinator Merritt.Steven@epa.gov 303-312-6146