An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EUROThe European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos) M. Dracos

  2. What is an EU Design Study? • The 27 European Union member states is in the process of creating a common Research Area with common Research Infrastructure • The EU funding for research is organized as Frame Work programmers with different components • The FP contributes with 5% to the total national research funding in Europe • We are presently working within the 6th FP • The Design Studies is one component in the FP and has as objective to provide first designs for possible common research infrastructure • The ESFRI (European Strategy Forum on Research Infrastructures, European roadmap for research infrastructures) committee establishes a priority list for new common infrastructure to which the EU is willing to contribute • The Design Studies is the first step in the process to qualify for financing from the EU for the infrastructure • For the infrastructure to be constructed a member state(s) or an intergovernmental organization must bid for it and offer an important part of the funding • International participation is strongly encouraged M. Dracos

  3. Work Program: Capacities EU call M. Dracos

  4. Design Studies budget M. Dracos

  5. Objectives of EURONU DS • The recent discovery that the neutrino changes type (or flavour) as it travels through space, a phenomenon referred to as neutrino oscillations… • The implications are far reaching… • Knowledge of the contribution of neutrinos in these areas needs precise measurements of the parameters governing neutrino oscillations. • This will require a new high intensity beam-based neutrino oscillation facility in which neutrino beams are generated using new and highly challenging concepts. • This Design Study will review all three currently accepted methods of realizing this facility (the so-called neutrino Super-Beams, Beta Beams and Neutrino Factories). • It includes a detailed study of the key technical challenges of the accelerator facilities, of the detector options necessary to measure the neutrino oscillation parameters and a comparison of the physics reach of these facilities. • The design study will also perform a cost assessment that, coupled with the physics performance, will permit the European research authorities to make a timely decision on the lay-out and construction of the future European neutrino oscillation facility. M. Dracos

  6. Neutrino Facilities H- linac 2.2 GeV, 4 MW H- linac 2.2 (3.5) GeV, 4 MW Accumulator ring + bunch compressor Accumulator ring + bunch compressor proton driver Magnetic capture Magnetic horn capture (collector) p Target Ionization cooling Target Drift hadrons n, m Phase rotation decay tunnel Linac  2 GeV ~300 MeV nm beam to far detector Recirculating Linacs 2  50 GeV Existing at CERN EURISOL DECAY RING Decay ring – 50 GeV 2000 m circumference Proton driver n beam to far detector Isol target & ion source B = 5T SPS L=6880 m New RFQ n beam to near detector Linac PS PSB p SPL Super-Beam Neutrino Factory Beta-Beam M. Dracos

  7. Participants M. Dracos

  8. Overview physics q13 CPV MSW … (non-acc.  ?) facilities SB BB NF technologies p-driver Cerenkov target LAr collector Emulsions m front-end magnetized m accel. stor. ring b beam detectors M. Dracos

  9. Work Packages and Deliverables in order to underline synergies… technologies p-driver Super-Beam Beam instr. target Detectors collector Near det. m front-end Far det. Neutrino Factory m accel. Perform. Physics stor. ring Comparison Beta-Beam b beam M. Dracos

  10. Objectives of the tasks • Management: • Lead and coordinate the DS • Comparison of the three facilities • Super beam: • Design of target and collector • Beam characteristics for the SPL superbeam • Specifications for the proton driver • Neutrino factory • Design of muon front end • Design of an acceleration scenario • Develop a conceptual design for proton beam handling after the primary production target (proton beam dump) • End-to-end simulation of the neutrino factory complex M. Dracos

  11. Objectives of the tasks • Beta-beam • Review acceleration scenario for high-Q value isotopes • Production of beta-beam isotopes with the production ring concept • Review decay ring design for high-Q value isotopes • Continue R&D on bunching • Detector task • Study a Magnetized Iron Neutrino Detector • Study a Cerenkov detector • Study a near detector • Physics task • Study physics performance • Make optimization of the different possible scenarios • Make a comparison M. Dracos

  12. Effort in people (120 person years) M. Dracos

  13. Organization M. Dracos

  14. Organization M. Dracos

  15. Money • Total cost: 14.45M€ • EC request: 4.8M€ • Ratio: 33% M. Dracos

  16. Time scale • In short: • We will work for 4 years • We hope to start beginning 2008 • We will use the last year for the comparison task M. Dracos

  17. EU decision • The proposal got a top ranking in the evaluation of the proposals • We have been invited to negotiate for a maximum 4 MEuro EU financing M. Dracos

  18. Annual meeting • Annual meeting to gather the Neutrino physics community and report on the progress of the study • The meeting will be combined with task meeting, management meetings and reviews • November 2008: CERN • November 2009: USA • November 2010: RAL (Project review) • November 2011: Paris • Your are invited to participate! M. Dracos

  19. Participation CNRS et CEA M. Dracos

  20. Participation CNRS et CEA M. Dracos

  21. End M. Dracos