1 / 20

FM Guidance for Design Teams MEFMA Focus Group

FM Guidance for Design Teams MEFMA Focus Group. Team Members. Neil Blakey FM Consultant, Mace Macro Stuart Clayton Project Manager, Serco Middle East Ryan Darnell Senior Services Manager, Khidmah Brad Robbins Director of Services, Khidmah. Focus Group Goals.

kapila
Download Presentation

FM Guidance for Design Teams MEFMA Focus Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FM Guidance for Design TeamsMEFMA Focus Group

  2. Team Members • Neil Blakey FM Consultant, Mace Macro • Stuart Clayton Project Manager, Serco Middle East • Ryan Darnell Senior Services Manager, Khidmah • Brad Robbins Director of Services, Khidmah

  3. Focus Group Goals To provide an “FM Guidance for Design Teams” briefing document to inform design teams, at all stages of the design & construction process, of the issues they should address to enable effective and sustainable FM operations to be undertaken. To identify those recommendations that are critical to effective operations and those that are simply ‘beneficial’ to FM operations. To be published by MEFMA to the benefit of members

  4. Setting the Scene Why should and FM be involved in the design stages of a development? With the increased cost in building operations there is a renewed focus on cost reductions with Facility Managers at the forefront. Many of the operational reductions would be made in a more cost effective manner in the design stages of a development rather than post handover. Davis Langdon Strategic Consulting Effect on Whole Life Cycle

  5. Setting the Scene: Current Market • Developer reluctance due to value vs. cost and limited understanding • Late engagement of FM expertise leading operational difficulties • Issues at Handover too little to late to attempt to rectify • Lack of Life Cycle Consideration or value in cost • H&S risks to operations valued in leasehold properties more and more • Additional operational costs due to lack of efficient operational methodologies which now has an impact with more educated owners and buyers comparing total cost of occupancy • Sophisticated Developers do this… though should we outline if this has better placed them in the market or the downturn with better products or not

  6. Literature Review • Developer Project Structures in developed countries • FM Design Activities in Industry guides and standards • Existing FM/Developer Processes

  7. Project Structure • From the literature review the Royal Institute of British Architects (RIBA) plan of work was chosen as most comprehensive and is followed by many leading developers.

  8. Project Structure Most organizations follow the RIBA project stages: A to L

  9. Project Structure

  10. Project Structure

  11. Challenges • Defining the user/s of the report • Focus Group members – Experience Not Diverse and all aligned • Restrictions on organizations Intellectual Property • Limited strata specific literature for design guidelines

  12. Progress The team is developing outline guidance for the Design stages: • Appraisal • Design Brief • Concept • Design Development • Technical Design Team is now developing actions for the Pre-Construction Stage

  13. Example of FM Design Guide Considerations • RIBA STAGE A – APPRAISAL • FM should be involved in Identifying the Stakeholder’s expectations and will consider the following from an FM perspective: • Use of the site by the Client • Site location: • Infrastructure: • Roads, Utilities, Public transport infrastructure, What is already in place • What options are available • Accessibility • Restrictions: • Zoning, Industry use, Freezone areas • Prestige associated with location • Environmental considerations • Location • Client desire e.g LEED/PEARL ratings • Site Procurement e.g. Leasehold/Freehold • End user, sale or return, what are the drivers e.g. Lifecycle considerations • Political and regulatory influences e.g. Anticipated code changes

  14. Survey Development Why produce a survey? • Narrow range of experience • Test our concepts The survey is designed to: • Gauge the industry importance placed on FM involvement in the design stage • Gauge level of FM involvement at present in projects • Discover any new processes being utilized in the industry • Develop trends on current review processes • Determine if special considerations are given to Strata developments • Expand upon our literature review findings. • The data will be key to determining further the audience for the report • The survey data will be presented in the final report

  15. Survey Content Information will allow group to differentiate data captured between FM Practitioners and Developers Information will gauge the level of importance placed on FM involvement in Design guidelines. Will also act as baseline.

  16. Survey Content Will allow Focus Group to plot the current trends in which stages FM’s are involved in Design Stage Will allow Focus Group to determine the percentage of organizations that have structure approach. Will allow FG to determine percentage that use internal vs. industry guidelines

  17. Survey Content Survey results can be correlated between development types Group is interested in Strata considerations given to design reviews and additional comments from survey participants

  18. Project Timeline Timeline • 26th September – Focus Group formed • 3rd of October - Review of Objectives • 3rd of October to 24th October - Literature Review • 24th October to 1st November - Compile Design Review Activities • 1st November to 14th November – Actions for Preparation • 14th November to 30th November – Actions for Design • 21st November to 4th December – Survey • 1st December to 21st December – Actions for Pre-Construction • 2nd January to 8th January – Actions for Construction • 9th January to 15th January – Actions for Use • 15th January to 26th January – Draft Report • 26th January – Submit draft to MEFMA Board for Review

  19. Forward Actions • Collate Surveys and review the implication of the survey results • Review remaining RIBA plan sections F-L • Review Focus Group structure and seek Developer/Project involvement • Involve additional representatives from Strata and Developer backgrounds • Group is presenting at Arabian Build and Construction Expo, taking place from 22 – 25 April 2012 with Cityscape

  20. Questions?

More Related