100 likes | 223 Views
Lecture 17 Runs With Delite Using Mentor II. Test cases are all in the files Run1.inp, Run2.inp, … Run6.inp. Run 1 Solution. 1. 4800 50%. 3. 960 10%. 2. 9600 Trunk. Link Cost = 5. 2880 30%. 960 10%. 5. 960 10%. 4. 6. Run 2 Solution – Special on 56K. 1. 4800 8.6%. 3.
E N D
Lecture 17 Runs With Delite Using Mentor II Test cases are all in the files Run1.inp, Run2.inp, … Run6.inp EMIS 8392
Run 1 Solution 1 4800 50% 3 960 10% 2 9600 Trunk Link Cost = 5 2880 30% 960 10% 5 960 10% 4 6 EMIS 8392
Run 2 Solution – Special on 56K 1 4800 8.6% 3 960 1.7% 2 9600 Trunk Link Cost = 10 2880 5.1% 960 1.7% 5 56000 Trunk 960 1.7% 4 6 EMIS 8392
Run 3 Solution – 2 Way Traffic 960, 960 10%, 10% 4800, 4800 50%, 50% 1 3 Link Cost = 5 2 9600 Trunk 2880, 2880 30%, 30% 960, 960 10%, 10% 5 960, 960 10%, 10% 4 6 EMIS 8392
Run 4 Solution – More Traffic 1 3 Link Cost = 6 9600, 4800 17%, 8.6% 2 9600 Trunk 1920,960 20%,10% 1920,960 20%,10% 5 56000 Trunk 3840,1920 40%,20% 3840,1920 40%,20% 4 6 EMIS 8392
Run 5 Solution – Expensive 56K, T1 1 3 Link Cost = 6 4800, 2400 50%, 25% 2 9600 Trunk 1920,960 20%,10% 1920,960 20%,10% 5 56000 Trunk 3840,1920 40%,20% 3840,1920 40%,20% 4 6 EMIS 8392
Run 6 Solution – Create Cycle 1 3 Link Cost = 9 2 9600 Trunk 5 56000 Trunk 4 6 EMIS 8392
Run 6 – JK’s Better Solution 1 3 Link Cost = 7 2 9600 Trunk 5 56000 Trunk 4 6 EMIS 8392
Run 6 – CPLEX Solution 1 3 Link Cost = 7 2 9600 Trunk 5 56000 Trunk 4 6 EMIS 8392
Do HW 14 EMIS 8392