An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mu2e Magnet Design Changes Contributors to the Mu2e Solenoid Design: N. Andreev, G. Ambrosio, R. Bossert, J. Brandt, M. Buehler, R. Coleman, D. Evbota, W. Jaskierny, V.V. Kashikhin, M. Lopes, J. Miller, T. Nicol, D. Orris, R. Ostojic, T. Page, T. Peterson, J. Popp, V, Pronskikh, Z. Tang, M. Tartaglia, Z. Tang, M. Wake, R. Wands and R. Yamada Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters Meeting

  2. Measure the Rare Process: m- + N  e- + N Mu2e experiment consists of 3 solenoid systems: Production Solenoid Transport Solenoid Detector Solenoid 1.0T protons e- m-, p- 2.5T 4.6T Production Target Stopping Target 2.0T Tracker Calorimeter Collimators Muon timing is important. Negative axial field gradients prevent unwanted trapped particles from entering “Search Window”

  3. Reason for Design Changes • Recommendations from May 2011 Independent Design Review • More operating margin for PS • Simplify DS • Better mechanical support for PS coils • Value Management exercise in Fall 2011 • Reduce cost of Solenoid project by ~$20M • Change in requirements • Field requirements have become less stringent with detailed beam studies Simplify magnet designs All Experimenters Meeting

  4. L2 Solenoid Changes Since May 2011 IDR 4.6 T peak field Less layers for PS • Production Solenoid (PS) • Transport Solenoid (TS) • Detector Solenoid (DS) • Cryogenic Distribution PS IRON Single Layer-shorter Spectrometer DS IRON • Power Supply/Quench Protection • Cryoplant • Field Mapping • Ancillary Equipment • Insulating vacuum • Installation and commissioning DOWN SCALED DOWN SCALED OFF PROJECT

  5. PS Baseline Design Changes Gradient made by 3 axial coils same turn density but change # of layers Wound on individual bobbins  • Peak field 5T- I operation ~10kA • NbTi Rutherford cable + Ni doped aluminum stabilizer (like ATLAS CS) • Indirect Cooling (Thermal Siphon) • Hadron absorber intercepts beam secondaries • ~20 Watts deposited in coils • Nominal peak field 4.6T • 5T still possible with reduced margin • Reduce number of layers • Thinner conductor (lower current) • Remove iron yoke  All Experimenters Meeting

  6. PS Field vs. Tolerance Bands Meets 5% field uniformity spec All Experimenters Meeting

  7. Collaboration with Japan Fabrication of practice PS coil at Toshiba (4 Layer/8 Turns) Uses aluminum stabilized NbTi conductor from Hitachi Cable Coil will be later tested at Fermilab All Experimenters Meeting

  8. New baseline Transport Solenoid • TS1,TS3,TS5: Straight sections with axial gradient • TS2/TS4: approximate toroidal field • Accomplished by many thin solenoid rings of different amp-turns TS2 TS1 • ThreeTwo cryostats: TSU, TSD Rotatable Collimator, P-bar window • TS3:  TS3U, TS3D. Wider coils to compensate for gap TS4 • New coil fabrication proposed for better mechanical support. G. Ambrosio TS Leader TS5 All Experimenters Meeting

  9. Coil Fabrication Al Outer Supports Conductor Bolted connections • Original plan: use SS inner bobbins  mechanical support complications. • New plan: fabrication unit consists of two coils with outer support aluminum structure • Coils wound on collapsible mandrel-then fit into outer aluminum ring • Placement of coil in transport is determined by outer shell geometry All Experimenters Meeting

  10. TS Field Requirements • All sections meet all requirements • Large margin wrt gradient requirement Axial field distribution in the center of TS3 (left), axial gradient along TS3 (right). All Experimenters Meeting

  11. Simplify DS Baseline • OLD base line • Two coils: gradient + spectrometer bussed in series in a single cryostat • Two layer spectrometer, single mandrel field uniformity • Two layer gradient on single mandrel with aluminum spacers • Iron return yoke (not shown) Gradient Section Spectrometer Section All Experimenters Meeting

  12. Simplify DS Baseline • New base line driven by relaxed field requirements • Modular coil design  reduced cost/coil • Spectrometer: 3 Single Layer Coils  shorter coils, greatly reduced conductor volume, reduced field uniformity OK • Original conductor cost estimate based on expensive PS conductor, smaller field DS requires smaller cross section, no need for special reinforced aluminum • Relaxed calorimeter field requirements shorten spectrometer Gradient Section Spectrometer Section All Experimenters Meeting

  13. DS Field vs. Tolerance Bands Gradient Section Spectrometer Section All Experimenters Meeting

  14. Conclusion • Significant amount of work done prior to CD1 • Conceptual design of solenoids • Technology development with Japan • Near term schedule • CD1 directors review April 3-5, Lehman review in June • June 2012-2014 • Test Toshiba coil/built prototype TS module/prototype conductor • CD2 sometime in 2014 • Order conductor/ Contract final design with industry • Begin fabrication in 2016 All Experimenters Meeting