1 / 15

L 2 C Learning to Collaborate

L 2 C Learning to Collaborate. Process and Outputs First Cycle: Months 1-6 INSEAD. Cycle 1: Process and Outputs. WP 1.1 Simulation Workshop (M3). Report Workshop results (M4). Reports on the different research fields (M5).

karis
Download Presentation

L 2 C Learning to Collaborate

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. L2CLearning to Collaborate Process and Outputs First Cycle: Months 1-6 INSEAD INSEAD Campus - Fontainebleau

  2. Cycle 1: Process and Outputs WP 1.1Simulation Workshop (M3) ReportWorkshop results (M4) Reports on the different research fields (M5) WP 1.2-1.7Research and State of the Art Review/ Best and Worst Practices (M1-5) WP 1.8Knowledge Integration (M5-6) Select relevant, operationalizable models for implementation D 1.1Knowledge harvesting/ integration(M6 or M7) WP 2.1ACDT Knowledge Base WP 2.2ACDT VLC WP 3ACDT Framework & Simulation Prototype Book“Understanding Collaboration Dynamics and Technologies” Articles 6 articles on different research areas INSEAD Campus - Fontainebleau

  3. Month 1-6 Tasks WP 1 Knowledge Harvesting and Integration (Month 1-6) WP 2 Knowledge management tools development (Month 5-8) INSEAD Campus - Fontainebleau

  4. WP 1 Knowledge Harvesting and Integration (Month 1-6) • Lead: UAFM • Start/End: M1- M6 • Alternative schedule: M1-M7 • Distribution of man months : INSEAD Campus - Fontainebleau

  5. WP 1 Objectives • 1. State of the art review in the following collaboration-related areas: • Motivational and Cultural dynamics (UCSC) • Knowledge-integration dynamics (UAFM) • Technology-enhanced workgroup dynamics (Insead) • Collaboration management competencies: Best/Worst Practices (Alpha) • Learning solutions addressing advanced collaboration dynamics (SCIL) • Advanced simulations and agent technologies (Insead) INSEAD Campus - Fontainebleau

  6. WP 1 Objectives 2. Focus on the question: In a SmallWorld Simulation focusing on collaboration challenges and traps, which are the BEHAVIORAL PATTERS and DYNAMICS which should be included to reflect today's know-how on the factors affecting the success/failure of collaboration initiatives? INSEAD Campus - Fontainebleau

  7. 3. These PATTERNS and DYNAMICS will then be “scenarioized” and embedded in the simulations (WP 3) to represent: • diagnostics challenges • intervention challenges • 4. The simulation experience will lead naturally to a discussion of the underlying models/insights/factors “explaining” the selected PATTERNS and DYNAMICS included in the simulation. INSEAD Campus - Fontainebleau

  8. Results from Tasks 1.1-1.7 will be integrated through Task 1.8 and lead to the following outputs: EC-related outputs 1. D1.1 ACDT Knowledge Harvesting and State-of-the-Art Report 2.Project Launch Workshop Report Internal outputs 1.Articles.Resulting from research from Tasks 1.2-1.7. 2.Book volume.We will consider publishing the insights gained in WP1 as a volume on the subject “Understanding Collaboration Dynamics and Technologies” INSEAD Campus - Fontainebleau

  9. WP 2 Knowledge Management Tools and Development • Lead: FVA • Start/End: M5 - M8 • Alternative schedule: M2 - M5 • Distribution of man months: INSEAD Campus - Fontainebleau

  10. WP 2 Objectives • 1. Design and implement first version of : • ACDT Knowledge Base • ACDT Virtual Learning Community • 2. Flow of results of WP 1 into the KM tool • 3. Involve all project members and their external networks in the use of VLC INSEAD Campus - Fontainebleau

  11. Scenario 1: Deliverable submission early Sept Process meeting 25-26/5(V2) Partners to present tasks progress and structure for partner feedback ~ 1 months WP 1 Partners to submit individual research piece by 1/7 (V3) 1.5 months T1.2 Motivation/Cultural Feedback from UAFM & INSEAD 15/4 T1.3 Knowledge integration Integration of individual pieces by UAFM and Insead in July T1.4 Technology enhanced workgroup dynamics Team/Task leaders to submit TOC & Task proposal due 30/3(V1) Feedback from UAFM & INSEAD 21/7 T1.5 Collaboration management competencies T1.6 Learning solutions for ACD Review meeting + final edits 31/7(V4) T1.7 Advanced simulations and agent technologies 1 month Submit Final version beginning Sept Commission Review end Sept INSEAD Campus - Fontainebleau

  12. Scenario 2: Deliverable submission early Oct Process meeting 25-26/5(V2) Partners to present tasks progress and structure for partner feedback ~ 2.5 months WP 1 Partners to submit individual research piece by 31/7 (V3) 1.5 months T1.2 Motivation/Cultural Feedback from UAFM & INSEAD 15/4 T1.3 Knowledge integration Integration of individual pieces by UAFM and Insead in Aug T1.4 Technology enhanced workgroup dynamics Team/Task leaders to submit TOC & Task proposal due 30/3(V1) Feedback from UAFM & INSEAD 1/9 T1.5 Collaboration management competencies T1.6 Learning solutions for ACD Review meeting + final edits 15/9(V4) T1.7 Advanced simulations and agent technologies 1 month Submit Final version beginning Oct Commission Review end Oct INSEAD Campus - Fontainebleau

  13. Other outputs for Months 1-6 • WP 7 : D7.1 Quality assurance plan due M 2 (Insead) • WP 5 : D5.1 Dissemination and exploitation plan due M6 (MeTis) INSEAD Campus - Fontainebleau

  14. Suggested Process for Months 1-6 • Month 1 (Mar) Kickoff meeting March 6-7 at Insead • Partners begin SOA literature review process • Month 2 (Apr) Continue work on WP tasks • WP 7 : D7.1 Quality assurance plan due (Insead) • Month 3 (May) Meeting for status report (end May) • EIS Simulation Workshop at the Q meeting, after which partners to provide insights on how to extend current simulation to address collaboration dynamics. • Month 4 (Jun) Continue work on specific WP tasks • Workshop report distributed to partners INSEAD Campus - Fontainebleau

  15. Suggested Process Month 5 (Jul) Task 1.8 consolidates T1.2-1.7 work Begin writeup for deliverable and book chapters WP 2 : ACDT knowledge base design early July (Insead) WP 2 : ACDT Virtual community design early July (FVA) WP 5 : D5.1 Dessemination and exploitation plan due Month 6 (Aug) Partners to start uploading and testing the KM tool Beginning month 6, task leaders to provide report on research outcomes for articles, deliverable and book volume D1.1 Deliverableof knowledge harvesting/integration due end Aug. Articles that correspond to Task 1.2-1.7 prepared by end Aug WP 2 : ACDT knowledge base implementation (Insead) WP 2 : ACDT Virtual community implementation (FVA) Month 7 (Sep) Quarterly meeting early Sep to discuss plan for next 6 months focusing on WP 2 (KM tool) and WP 3 (ACDT framework and Simulation prototype development) INSEAD Campus - Fontainebleau

More Related