1 / 7

NSF Review of Milagro

NSF Review of Milagro. July 18-19 Los Alamos, NM. What is Being Reviewed. NSF – How long to continue to operate? 1 or 2 more years Option 1 means using last year of operations funding for D&D Us – General review of technique Includes view of our accomplishments View of our future

karli
Download Presentation

NSF Review of Milagro

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NSF Review of Milagro July 18-19 Los Alamos, NM Gus Sinnis

  2. What is Being Reviewed • NSF – How long to continue to operate? • 1 or 2 more years • Option 1 means using last year of operations funding for D&D • Us – General review of technique • Includes view of our accomplishments • View of our future • 1-2 more years of Milagro ops • miniHAWC startup Gus Sinnis

  3. Structure of Review • June 18 • 9am ~1 hour at LANL • Overview of physics and timeline of review • Overview of operations • Site visit and lunch (4 hours including travel) • 2pm Resume talks at LANL • June 19 • Talks on future • Wrap-up • Meeting between Boyd, Whitmore, and Bowles Gus Sinnis

  4. Milagro Talks • Geared on physics • Answer the questions • What are our capabilities? • What have we done to date • What do we lose if we turn Milagro off? • What do we gain with 2 more years of operations • Talks must be concise and to the point • 20 minutes is all you get and expect to be interrupted often Gus Sinnis

  5. Milagro Talks • Overview and outline of review • Operations including daq system and data pipelining/online processing and analysis • Techniques talks • Background rejection: X2, AX4, pChi • Importance of outriggers (AX4) • High S/B data set (35%!!) • Energy Spectra • Convince them we can do it! • Based on distribution of signal in X2 space • If available – based on outriggers and event-by-event measurement Gus Sinnis

  6. Milagro Talks • GRB Physics • Online untriggered • Offline triggered • Emphasize SWIFT results and why we need 2 more years • Extended sources • Cygnus region • EGRET unID region (what does HESS see?) • Large-scale Anisotropy • Galactic plane • What do we gain by 2 more years? • What can we say about energy spectrum? • What physics does this address Gus Sinnis

  7. Milagro Talks • Future Plans • HAWC and miniHAWC • Tests to be done using Milagro • Wrap-up • Summarize our accomplishments • Emphasize our strengths • Extended sources • GRBs Gus Sinnis

More Related