110 likes | 213 Views
Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector. Procurement Guidance Documents. Part A: Rural Water Modulw (DBO) Part B: Small Wastewater Projects Part C: Small Water Supply Projects. Part C: Small Water Supply Projects.
E N D
Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector
Procurement Guidance Documents Part A: Rural Water Modulw (DBO) Part B: Small Wastewater Projects Part C: Small Water Supply Projects
Part C: Small Water Supply Projects Chapter 12: Conventional Procurement for GWSS
Prior to Group employing Consulting Engineer Local Authority will (a) Prepare Brief (b) Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction.
Scale of fees: (a) Fee per member for preparation of design drawings and calculations still valid. (b) Scale of fees based on Circ. 11/87 Preliminary Report 0 – 20% Design and Tender Drawings. Up to 30% Conditions of Contract / Specifications. 0 – 20% Construction Stage. 0 – 30% (c) PSDS accures separate fee. (ACEI scale of fee dated 9/2/96)
OJEU OJEU National Newspapers National Newspapers Three Prices Three Prices One Price One Price L. Doyle Services The Procurement “Goalposts” Waste Water Directive 04/18/EC Water Directive 04/17/EC € 422,000 € 211,000 € 127,000 € 12,700
L. Doyle The Procurement “Goalposts” Works Waste Water Directive 04/18/EC OJEU € 5,278,000 National Newspapers Water Directive 04/17/EC € 127,000 Three Prices € 12,700 One Price
Water Quality Water Conservation
New & Upgrade (85%) Takeover (100%)
DBO Civil (85%) M&E (100%)
Metering grants for DBO only. Universal Metering Domestic (85% grant subject to max €300) Non-domestic (85%) grant subject to max €250) Additional CLAR funding