70 likes | 144 Views
Concrete after blastrac surface preparation. DOC. NO. CH029. If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Application of product by screed box. CH029.
E N D
Concrete after blastrac surface preparation. DOC. NO. CH029
If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Application of product by screed box. CH029
If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Leveling of screeded material with single pass of trowel. CH029
If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Complete compaction (closing) of trowel coat with power trowel. CH029
If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Application of single broadcast coat over trowel coat. CH029
If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Further application of single broadcast coat over trowel coat. CH029
If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Finished floor after application of clear Dresscoat. CH029