Covanta Energy Ltd

Covanta Energy Ltd. Content of Environmental Permit Application Nick Gamble. Applying for a Permit for an Installation. The Application Process (1) An application must— (a) be made by the applicant on the form provided by the EA; and (b) include the information specified on the form.

Download Presentation

Covanta Energy Ltd

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble

  2. Applying for a Permit for an Installation • The Application Process (1) An application must— (a) be made by the applicant on the form provided by the EA; and (b) include the information specified on the form. (2) Every application must be accompanied by any fee prescribed in a charging scheme made by the regulator under section 41 of the 1995 Act or by the appropriate authority under regulation 65. • The EA provides • General Guidance on applying for a Permit and on Risk Assessment • Specific Guidance on Waste Incineration • The “operator” must apply for the permit

  3. Getting the Permit • The Process: • Submit the application to the Environment Agency • Wait for it to be “duly made” • EA advertise the application – available on Covanta web-site • Public Consultation period of 4 weeks • Respond to requests for further information (“Schedule 5 request”) • Draft Permit issued to Covanta to check accuracy • Draft then issued for public consultation • Environment Agency issues permit • The process should take 4 months to issue of draft permit, but may take longer. • The clock stops while responding to Schedule 5 requests.

  4. What is in the application? • Application Form (Parts A, B2, B3 and F1) • Supporting Technical Information • Information on Raw Materials • List of emissions • Description of Monitoring methods • Justification of Technology (BAT) • Justification of Energy Efficiency • Information on Waste Recovery and Disposal • Management • Specific questions for legislation (WID) • Site plan and location plan • Environmental Risk Assessment • Qualitative Risk Assessment - tabular • Air Quality Assessment • Noise Assessment • H1 Assessment – Environmental Risk • Application Site Report • Non-Technical Summary

  5. Table of Contents • The Application Forms • Non Technical Summary • Supporting Information • Annex 1 – Plans and Drawing • Annex 2 – Site Condition Report • Annex 3 – Noise Assessment • Annex 4 – Environmental Risk Assessment • Appendix A – Greenhouse Gas Assessment (WRATE analysis) • Annex 5 – Air Quality Assessment • Annex 6 – BAT Assessment • Annex 7 – Human Health Assessment

  6. Thank you for listening