350 likes | 526 Views
Great Basin PMC. Long-term Plan Short-term Plan. Great Basin Plant Materials Center. Collect, test, and select adapted native plant materials Develop native plant production practices, and restoration and rehabilitation methods. Great Basin PMC. Long-term Plan
E N D
Great Basin PMC Long-term Plan Short-term Plan
Great Basin Plant Materials Center Collect, test, and select adapted native plant materials Develop native plant production practices, and restoration and rehabilitation methods
Great Basin PMC Long-term Plan • Produce native seed, plants, and technology Short-term Plan • Build the PMC into a capable facility
Great Basin Plant Materials Center Service Area
21 – Klamath and Shasta Valleys and Basins 23 – Malheur High Plateau 24 – Humboldt Area 25 – Owyhee High Plateau 26 – Carson Basin and Mountains 27 – Fallon-Lovelock Area 28B – Central Nevada Basin and Range 29 – Southern Nevada Basin and Range Great Basin Plant Materials Center Major Land Resource Areas
1 Northwest Region 2 Black Rock Desert Region 3 Snake River Basin 4 Humboldt River Basin 5 West Central Region 6 Truckee River Basin 7 Western Region 8 Carson River Basin 9 Walker River Basin 10 Central Region 11 Great Salt Lake Basin 12 Escalante Desert Basin 13 Colorado River Basin 14 Death Valley Basin HydrologicRegions http://water.nv.gov/WaterPlanning/basins/hydro_nv.cfm
GBPMC Long-term Plan • Buildings • Irrigation • Weeds • Seed collection • Seed production • Seed cleaning and storage • Staff • Farm plan
GBPMC Long-term Plan Buildings • Office and laboratory • Seed cleaning • Seed storage • Greenhouse
GBPMC Long-term Plan Irrigation • Repair the existing system • Drip irrigation systems • Sprinkler irrigation systems • Control the gopher population
GBPMC Long-term Plan Weeds • Exhaust the soil seedbank • Control existing populations • Eradicate noxious perennials
GBPMC Long-term Plan Seed collection • Lists of species of concern • Field work • Summer interns • Graduate students
GBPMC Long-term Plan Seed production • Identify priority species • Plant and manage fields • Develop harvest procedures
GBPMC Long-term Plan Seed cleaning and storage • Small quantities on site • Large quantities: Transport to an established facility
GBPMC Long-term Plan Staff • Botanist or plant ecologist • Technical support for their position • Farm foreman • Crew labor
GBPMC Long-term Plan Farm Plan • Conservation planning • Building locations • Physical security • Roads, bridges, ditches • Irrigation system optimization
Four Technical Committees • Marketing • Cultural Resources • Vegetation Management • Threatened and Endangered Species
Great Basin PMC A “seedling” compared to 26 others Acres = 115, Avg. = 179 Age = 2 yrs, Avg. = 52 Staff = 2, Avg. = 5.2
Short-term Plan 2009 • Greenhouse construction • Seed collection
Short-term Plan 2009 On-Center Trials • Herbicide trial with UNR • ELEL Inter-Center Strain Trial • Demonstration Garden • POSE Common Garden Study
Short-term Plan 2009 • RR forage soybean green manure • Irrigation system repair, improvement • Farm equipment acquisition
Short-term Plan 2009 Off-Center Studies • Rosaschi Ranch • Other opportunities
Collaboration is essential for Great Basin PMC to achieve its Long-term Goals • USDI Bureau of Land Management • UNR College of Agriculture, Biotechnology, and Natural Resources • Native American Tribes and Bands • USDA Agricultural Research Service • USDA Forest Service • University of Nevada Cooperative Extension • USDI Fish and Wildlife Service • Nevada Department of Agriculture • Nevada Division of Forestry • Conservation Districts • Private Landowners