1 / 10

Adanda for today: Problem in systems development PS1.

Adanda for today: Problem in systems development PS1. Overview af the semester The history of systems development Problems in systems development. Semester walktrough System Development and Project Management. Literature; Professional System Development. Finn Kensing a.o.

Download Presentation

Adanda for today: Problem in systems development PS1.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Adanda for today:Problem in systems development PS1. Overview af the semester The history of systems development Problems in systems development

  2. Semester walktrough System Development and Project Management Literature; • Professional System Development. Finn Kensing a.o. • Applying UML and Patterns. Graig Larman • Notes (Test, User interface, Database)

  3. The history of systems development • History of systems development • Phase 1: the 40’ and the 50’ties • Phase 2: the 60’ties • Phase 3: the 70’ties • Phase 4: the 80’ties • Phase 5: the 90’ties • The scandinavian model

  4. The history of systems development

  5. The Scandinavian model • Union <> New technology • End user participation • Objectoriented view on systems development (Simula 67, C++)

  6. Professionel System DevelopmentChapter 1. Typical problems. Insufficient analysis (Breaks Boeing) Unreflected design process (Danish defence) No baselines (SLV road control) Incomplete test (Digiquant) Many postponements (DSB Danish railroad) Narrow communication lines (Statens Serum Institute) Need for professional working practices (Many new employees)

  7. Ideal and reality

  8. Ideal and reality Why not? • The users don’t know what their own goal is • New knowledge trough the system development process • High complexity

  9. Situation an uncertainty Routine Problem solving Problem setting

  10. The project and its enviroment The situation which arise in the project The working practices which are applied in the project The conditions which affect the course of the project

More Related