An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TREADSSemester Review Dec. 14, 2007

  2. Objectives • Assess and Communicate Current Design • Identify interfaces • Approve the System Requirement Specification • Formalize the design • Obtain approval to purchase parts and begin assembly

  3. Agenda • Mission Concept of Operations • Subsystem Briefs • Structures • Design, Analysis. Vibration Analysis • Thermal Analysis • DIB/SMB • Power System • Architecture, Power Budget • Communications • Schedule

  4. Provide mission Objectives • Why are you doing this? • At a high level, how will you do this. • What are you major mission requirements or limitations Mission Statement

  5. Concept of Operations Falcon 1 User’s Guide, SpaceX TREADS Operations (1 Year) Launch

  6. Nominal Timeline System Checkout Nominal Operations Mission Start First Ground Contact FC Boot Up LV Activities Launch Tertiary Payload Release Primary Payload Release Ground Ops S/C Ops Secondary Payload Release Exec. Schedule TREADS Power On Schedule Uplink Exec. DUT Test(s) Customer Feedback Data Downlink Charge Batteries

  7. System Level Review • Functional Block Diagram Examples • Major System level capabilities and requirements. • Give enough context for the sub-system sections to make sense. • Full System review at the end • Mass, Volume…..

  8. Sub Systems Review • List major requirements and capabilities. • List major components. • List major concerns.

  9. Systems Review • Total System Level requirement Compliance • Power, Mass, Volume

  10. Acceptable Mass Budget

  11. Electronics Risks