1 / 7

Background to Coordination In the MFI Industry in Uganda

Background to Coordination In the MFI Industry in Uganda. Microfinance Forum (MFF) Started as a MFI Coordination Committee in 1997 to respond to gaps in financial services provision and lack of coordination; Initiative of practitioners and MoFPED, recognized as policy advisory organ;

katelin
Download Presentation

Background to Coordination In the MFI Industry in Uganda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Background to Coordination In the MFI Industry in Uganda • Microfinance Forum (MFF) • Started as a MFI Coordination Committee in 1997 to respond to gaps in financial services provision and lack of coordination; • Initiative of practitioners and MoFPED, recognized as policy advisory organ; • Operates through 3 Committees (Lobby, Apex, Data) and Subcommittees; • Achievements (MDI Act 2003, MOP, MCAP, Capacity Building….)

  2. Transformation Steering Committee (TSC) • Started informally between major donors, Formalized in 2004 by to the sector (WB, rSPEED, DFID/FSDU, GTZ/SIDA FSD, MOP), joined by MCAP Fund, PSF/PSCP II Project, BOU and Microsave (observer capacity) • Goals: Coordination, support for mature MFIs, technical assistance, and information exchange

  3. TSC - Operations • Operations • Annual appointment of Chairperson, Transformation and Consolidation Consultant at FSDU serves as Admin/Secretary to TSC; • Meets quarterly to review issues for the quarter (pre and post-transformation grant requests, capacity building, and emerging challenges;

  4. TSC - Achievements • Coordinated grants of US$ 2.5 m as of 31st Dec 2005 to 5 institution (4 granted MDI licenses), Faulu in line next; • Generally Harmonized Donor Positions through Formal/ Informal Info Exchange; • Better Accountability and Targeting of Grant Funding; • Eliminated Duplication in Grant Funding;

  5. TSC - Achievements • Spawned other Steering Committees • VSLAs comprising of CARE, FSDU, Plan International, CRS, American Refugee Committee (ARS), MOP; • Rating Steering Committee comprising of SUFFICE, FSDU, AMFIU, GTZ/SIDA, rSPEED, Planet Rating; • Consumer Education Steering Committee (planned)

  6. TSC - Challenges • Slow Utilization of Post-Transformation Grants; • Lack of Upcoming Transformation Candidates – TSC reinventing itself to handle linkages, Consolidation and Restructuring; • Accountability – Budget Support, Project, or Institutionalization e.g. SACCOrization and merger of all coordination to sector.

  7. Challenges for the TSC • Limited Willingness to Share Strategic Frameworks, Concepts and Workplans; • Policy and Procedural Constraints e.g. stringent WB procurement guidelines; • Shifts in Government Policy; • M&E: accountable grants vs. direct procurement; • Expiry of Member Projects; • Exit Strategy

More Related