Kolb Road Sabino Canyon to Sunrise Drive. September 20, 2018 CAC Update Meeting. Kolb Road Project Topics. Project Status Update Project Art Update Landscape Update Open Discussion Comments/Discussion. Project Status Update. Final Plans Under Review Artwork – Being Finalized
E N D
Kolb RoadSabino Canyon to Sunrise Drive September 20, 2018 CAC Update Meeting
Kolb Road Project Topics • Project Status Update • Project Art Update • Landscape Update • Open Discussion • Comments/Discussion
Project Status Update • Final Plans Under Review • Artwork – Being Finalized • Landscape - Being Finalized • Major Utility Efforts Starting • CenturyLink, SWG, TEP, Comcast, Tucson Water • Right of Way Acquisition - Ongoing • Federal Funding Authorization – Spring 2019 • Project Bidding – Summer 2019 – Utility Relocation Driven • Construction Kick Off Meeting – After Award
Project Art Update • Same concept, new shape: an abstract, organic sculpture inspired by nature • Placement: 3 large-sized shapes in roundabout and 2-3 smaller-size along Kolb next to sidewalks • Medium: metal with mosaic inlay
Project Art Update • Sample views: Proposed size: large 11’ and small 5-7’
Landscape Update • Landscape to feature native, low water use plantings • Plant palette based on native plants found on site • Two example areas of landscape plan • Proposed slope treatments and examples • Collaboration with public artist at Roundabout
Landscape Update Landscape Palette
Landscape Update Landscape Plan Example Area
Landscape Update Landscape Section Example Area.
Landscape Update Landscape Plan Example Area
Landscape Update Landscape Section Example Area
Landscape Update Slope Treatments
Landscape Update Landscape Plan Roundabout Area
Landscape Update Landscape Plan Roundabout Area
Landscape Update Landscape Section Roundabout Area