1 / 12

On the Time Scheduling Problem of Uniform Recurrence Equations

On the Time Scheduling Problem of Uniform Recurrence Equations. Wei-Yang Lin and Tai-Lin Chin ECE 734 VLSI Array Structures for Digital Signal Processing. Uniform Recurrence Equation. URE Definition: where. Ex: matrix multiplication AB=C. Linear Schedule: Xp.

kathy
Download Presentation

On the Time Scheduling Problem of Uniform Recurrence Equations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. On the Time Scheduling Problem of Uniform Recurrence Equations Wei-Yang Lin and Tai-Lin Chin ECE 734 VLSI Array Structures for Digital Signal Processing

  2. Uniform Recurrence Equation • URE Definition: where Ex: matrix multiplication AB=C

  3. Linear Schedule: Xp

  4. Uniform Schedule: Xp+ci

  5. Affine Schedule: Xip+ci • Execution Time: • Linear schedule: 2N-1. Affine: N

  6. Scheduling Vector X • The scheduling vector X can be obtained by solving a linear programming problem. • Example: Linear Schedule Duality XD1

  7. Multi-dimensional Schedule • Multi-dimensional Uniform Schedule • Multi-dimensional Affine Schedule

  8. Multi-dimensional Affine Schedule

  9. Case Study • EX:A complex loop

  10. Solution

  11. Execution sequence

  12. Conclusion • Linear schedule • Uniform schedule • Affine schedule • Multi-dimensional schedule • Case Study • Convolution • FIR filter • Selection sort • A complex loop case

More Related