Revision Requests Voting • NPRR850, Market Suspension and Restart (Vote) • This Nodal Protocol Revision Request (NPRR) lays out principles for ERCOT and Market Participants to follow in the event of a Market Suspension and Market Restart; and specifies the means of Settlement during a Market Suspension and for Market Restart. • http://www.ercot.com/mktrules/issues/NPRR850#keydocs • On October 19, 2017, Texas SET Working Group reviewed NPRR850 and submits these comments to clarify language in Nodal Protocol Sections, 25.6, Retail Operations and Section 25.6.1, Retail Operations Market Suspension Procedures, which RMS reviewed and Unanimously Endorsed during their November 7, 2017 meeting. The intent of these changes is to distinguish the ERCOT retail Market Participant start up procedures from other retail Market Participant start up procedures. • This endorsement will be provided to PRS during their November 9th meeting RMS Update to COPS
Revision Requests Voting • NPRR851, Procedure for Managing Disconnections for Bidirectional Electrical Connections at Transmission Level Voltages(Vote) • This Nodal Protocol Revision Request (NPRR) was developed to fully implement the market design envisioned in NPRR 596, External Load Serving Entities. This NPRR establishes a clearly defined disconnection process within ERCOT market rules applicable to a transmission voltage connection to the ERCOT grid which utilizes one electrical connection for both generation and load services. • http://www.ercot.com/mktrules/issues/NPRR851#keydocs • At its November 7, 2017 meeting, RMS Unanimously voted to recommend that PRS Table and Refer NPRR851 to RMS. • This recommendation will be provided to PRS during their November 9th meeting RMS Update to COPS
Revision Requests Voting • RMGRR132, NOIE Disconnect and Reconnect Process (Vote) • This Retail Market Guide Revision Request (RMGRR) provides Non Opt-In Entities (NOIEs) with the ability to disconnect retail Customers for non-payment by integrating them into Section 7.6, Disconnect and Reconnect for Non-Payment Process. It also exempts NOIEs from the Texas Standard Electronic Transaction (TXSET) process if they utilize it less than 25 times per month http://www.ercot.com/mktrules/issues/RMGRR132#keydocs • During the November 7, 2017 RMS meeting – RMS Unanimously voted to continue Tabling RMGRR132 until the December 5, 2017 RMS meeting. • NOTE: This should allow more time for NPRR851 to work its way through the market’s approval process and/or more time for the submitter to make the determination that this RMGRR is no longer needed by requesting withdrawal. RMS Update to COPS
Working Group/Taskforces Updates • Texas SET (TX SET) in collaboration with Texas Data Transport and MarkeTrak Systems (TDTMS): • Oct 16, 2017: ERCOT code uploaded to Retail Market Testing Environment (RMTE) available for ad-hoc testing. • Oct 19, 2017: RMS Workshop – NPRR778, Modifications to Date Change and Cancellation Evaluation Window • Nov 1, 2017: Market Notice to include Testing Details; Kick-Off Call reminder; End-to-End coordinated testing sign up reminder • Nov 10, 2017: End-to-End coordinated testing sign up deadline • Nov 15, 2017: NPRR778 Testing Kick-Off Call (9:30am – 11:30am during TDTMS meeting) • Nov 20 – Dec 7, 2017: End-to-End coordinated testing window • Dec 9-10, 2017: NPRR778/RMGRR139 Go-Live • Dec 11, 2017: Market Notice to remind MPs to utilize transactions in lieu of day-to-day usage of MarkeTrak Cancel w/ Approval (per NPRR778) • Feb 1, 2018: Market Notice to remind MPs that TDSPs will cease support of daily use of MarkeTrak Cancel w/ Approval on March 1, 2018 • Mar 1, 2018: TDSPs to cease support of daily use of MarkeTrak Cancel w/ Approvals RMS Update to COPS
Working Group/Taskforces Updates • Texas SET (TX SET) in collaboration with Texas Data Transport and MarkeTrak Systems (TDTMS): • On 10/19/17 TXSET & TDTMS Working Groups held a Workshop for NPRR778 to outline processes, timelines and address any questions or concerns received from Market Participants about upcoming End-to-End (E2E) testing. • NPRR778 Test Scripts for End-to-End (E2E) testing: • TDTMS reviewed ERCOT’s changes to the 2018 Retail SLA and recommended that RMS approve those edits in the 2018 SLA as presented by ERCOT. RMS Update to COPS
Working Group/Taskforces Updates • ERCOT Retail Market Instructor Led Training • Retail 101 Training • Tuesday, November 28, 2017 • 9:00 AM – 4:30 PM • CenterPoint Energy • 1111 Louisiana Street – Houston, TX Conf. Room 1360 • Inadvertent Gain (IAG) Training • Wednesday, November 29, 2017 • 9:00 AM – 4:30 PM • CenterPoint Energy • 1111 Louisiana Street – Houston, TX Conf. Room 1360 RMS Update to COPS
Retail Training Instructor Led Classes – Proposed for 2018 RMS Update to COPS
Working Group/Taskforces Updates • Advanced Metering Working Group (AMWG) • Posting of Monthly reports and Key documents : http://ercot.com/committee/amwg • PUCT Project #47472 – “COMMISSION STAFF'S PETITION TO DETERMINE REQUIREMENTS FOR SMART METER TEXAS” • Cross-rebuttal testimony due 11/14 • Objections to Cross-rebuttal testimony due 11/20 • Hearing on the Merits are planned for 2 Days on Mon. December 4 and Tues. December 5, 2017 • For Additional Details and Dockets: • http://interchange.puc.texas.gov/WebApp/Interchange/application/dbapps/filings/pgControl.asp?TXT_UTILITY_TYPE=A&TXT_CNTRL_NO=47472&TXT_ITEM_MATCH=1&TXT_ITEM_NO=&TXT_N_UTILITY=&TXT_N_FILE_PARTY=&TXT_DOC_TYPE=ALL&TXT_D_FROM=&TXT_D_TO=&TXT_NEW=true RMS Update to COPS
SMT Disaster Recovery Activities • SMT Disaster Recovery (DR) Exercise • Saturday November 4, 2017 00:01 A.M. CST until Saturday November 4, 2017 12:01 P.M. CST (12 hours) – • SMT conducted the fail over process from the SMT Production environment to the SMT Disaster Recovery (DR) environment. • This fail over process to the DR site completed successfully. • Saturday November 11, 2017 00:01 A.M. CST until Saturday November 11, 2017 12:01 P.M. CST (12 hours) – • SMT will conduct the fall back process from the SMT Disaster Recovery environment to the SMT Production environment. • The following services will be unavailable: • Web Site Portal Functionality • Reporting - Ad Hoc, Green Button, Scheduled, Enrollment and Historical Backfill • HAN Services • On Demand Reads • Third Party RMS Update to COPS
SMT Statistics for September 2017 • Total SMT Help Desk Calls 359(523) Aug. 2017 • Total SMT Help Desk Tickets 313(411) Aug. 2017 • Residential = 262 • GUI access issues = 76 {U/ID & P/W Invalid} • Registration issues = 119 {Typo errors} • 3rd Party Issues = 14 {Required Registration Assistance} • SMT Registered Users (Res) 102,218 (+1,523 vs. August 2017) • ESIs in SMT 7,346,549(+2,075 vs August 2017) • Active Meters in SMT 7,290,975(+3,861 vs August 2017) RMS Update to COPS
SMT Statistics for September 2017 • Energy Data Agreements 18,029(+522 vs Aug. 2017) • Total * Agreements 18,333(+633 vs Aug. 2017) * Active and Pending • AEPC =238; AEPN = 77; CNP = 3,150; Oncor = 13,632; TNMP = 995 • HAN Device Agreements 240 (-1) • HAN Devices 8,089 (-106) • 3rd Parties Registered @ SMT 126 (+1) • REPs Registered @ SMT 117 ( NC) • On Demand Reads • Customer 6,133 • REP 13 • 3rd Party 0 RMS Update to COPS
ERCOT Updates: • Service Availability – October • Retail Market IT systems met all SLA targets • Incidents & Maintenance – October • None to report • Maintenance – November, December • ERCOT will be performing a technology refresh of the Retail Processing environment • Infrastructure upgrade, no functional change • 11/15/17 – Retail Market Test Environment (RMTE) Upgrade • 11/15/17 – 12/02/17 – RMTE testing window • 12/03/17 – Production environment upgraded during Sunday maintenance RMS Update to COPS
ERCOT Updates: • MarkeTrak Performance – October RMS Update to COPS
ERCOT Updates: • 2018 Retail Market SLA (Vote) • 14. Retail SLA 2018 Draft • RMS Unanimously Approved this SLA as recommended by ERCOTand TDTMS. • Flight 1017 Market Testing – 100% Complete • Flight 0218 Signup deadline is 01/17/18 • Connectivity testing begins on 01/23/18 • Day 1 transactions begin on 02/12/18 • Flight 0218 is scheduled to conclude on 02/23/18 • Flight 1017 Adhoc signup deadline is 02/23/18 • Contingency/Adhoc period concludes 04/06/18 RMS Update to COPS
ERCOT Updates: • August 2017 Inadvertent Gains Reporting: • 14. Inadvertent Stats August 2017 • Digital Certificate Download Process • 14. Digital Certificate Download Process 110317 • Host Market conference calls to communicate the impact of changes and answer questions (November and January) • Final dates will be communicated via Market Notice • Proposed dates: Wed. 11/15/17 1:00 – 2:00 PM, Wed. 01/17/18 1:00 – 2:00 PM • Retail Project(s) Update: • 14. Retail Projects Update • PR173-02 ERCOT Flight Certification Website – Replacement of the external web interface • NPRR778, Modifications to Date Change and Cancellation Evaluation Window RMS Update to COPS
“Other Business/Announcements” • Oncor System CIS Conversion and Planned Outage Market Conference Call planned today: • Wednesday, November 8, 2017 @ 11:00 A.M. - 12:00 P.M. • Standard Dial-in: (832) 445-3194 • Toll Free: (866) 310-1577 • Conference Code: 2693700 # • PUCT Staff FEMA Update/Market Q&A • Per PUCT Staff, FEMA and General Land Office (GLO) are starting to deploy FEMA Trailers. Small numbers deployed in AEP’s Service Territory right now and larger numbers expected in CNP’s Service Territory. Currently the GLO is trying to finalize engineering specifications for installation of these trailers to be utilized across all utilities’ service territories including MOU/EC service areas. • To monitor PUCT activities on this and other topics go to PUCT Project 47552 at http://www.puc.texas.gov/ RMS Update to COPS
“Workshop IV following RMS” • Workshop IV: Mass Transition of ESI-IDs between Sharyland and Oncor: • Informational Workshop 4 SU and Oncor Transition (Final Version) • Workshop 4 SU Oncor Transition Dates RMS Update to COPS