40 likes | 135 Views
PER Ron Jackson Mission Assurance Manager 510 643-2625 FM2 Data Book Review FM1 – FM6 Instrument Configuration Control QA Verification of JPL Processes/Material Used during Environmental Tests. Verify: All test setups. ESD TQCM Calibration of all equipment used in Test MAG setup
E N D
PER • Ron JacksonMission Assurance Manager 510 643-2625FM2 Data Book Review • FM1 – FM6 Instrument Configuration Control • QA Verification of JPL Processes/Material Used during Environmental Tests
Verify: • All test setups. • ESD • TQCM • Calibration of all equipment used in Test • MAG setup • Training certifications • Safety • Air particle levels • Material/Source Certifications • Approve Procedures/Redlines