210 likes | 316 Views
(Title) – Final Design Review (FDR). Edits are made on the slide master accessed via: /View/Master/Slide. Update logo. Date of Review First Use Acknowledgements Image of diagnostic. Establish Key Contacts. (name) PI (name) PA. LLE Will Complete after the review.
E N D
(Title) – Final Design Review (FDR) Edits are made on the slide master accessed via: /View/Master/Slide Update logo Date of Review First Use Acknowledgements Image of diagnostic Establish Key Contacts (name) PI (name) PA LLE Will Complete after the review Update Date from: /View/Master/Slide Master Enter number of pages – required for PDM submittal 5/17/10
Overview - Motivation -Summarize Scope-Summarize Motivation Campaign Details:EP or Omega Or Joint Shot?;Campaign Type? Side Lighter/ Back Lighter?What TIM’s or Fixed? High Xrays, High Yield? High EMP?, Tritium? 5/17/10
Requirements List RequirementsMechanical - PositioningPerformanceAccuracy Show/Validate that the requirements have been met 5/17/10
Target Diagnostic Check List (Diagnostics Only) – Disclose Equipment Requirements Double Click and Edit; Items marked “Y” should show up on a slide in the presentation 5/17/10
Design Concepts • 1) Present Design – LLE will ask questions on the following topics (be prepared): • Weight • Rigging – CG – Handles that straddle CG • Vacuum/optical Compatible materials • FEA • Safety Note must be in LLE ME hands prior to FDR • 2) “Target Diagnostic Check List” Cover Items checked “Y” • 3) Issues Options Trade offs 5/17/10
Beam Envelope – Clearances – Space Envelope Step File must be sent to LLE 1 week prior to the review for beam clearance and space envelope checks 5/17/10
P &ID – Tutorial Located on LLE Web Site 240 psi 240 psi 240 psi pump 5/17/10
System Level Cabling Diagram – Shows system interconnects 5/17/10
Detail Electronic Design – (show wire numbers/cabinets) Need to show cable and wire numbers – cable connections is a significant cause of shot delays 5/17/10
Space Claim – Floor Plan Temporary Scopes and PS’s 5/17/10
Operations Installation steps Setup/Alignment Overview Typical Shot – Steps to Service diagnostic SRF Definition Status of Procedure –install, Alignment and shot operations draft procedure must be submitted to LLE prior to FDR 5/17/10
CDR Action Items Copy CDR Action Items Table Here; Review after the design presentation; this helps LLE to understand the items are addressed 5/17/10
Viewing/Editing SRA – 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3)Edit then Select Save & Print 4)This button allows the SRA to be viewed/printed/saved – Save the SRA 5)Take a screen shot of the SRA and place in presentation 2) Select SRA 5/17/10
SRA 5/17/10
FMEA – Each Entry on SRA requires an Entry on FMEA; additional entries can be made Enter the Line #’s into the SRA Form (Associated Risk) There must be a change in one of these two columns (Before vs After) Double Click & Edit 5/17/10
Viewing EQC 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3) Select “Save & Print Landscape”; Take a screen shot of each page and put in presentation (two slides) 2) Select EQC 5/17/10
EQC 5/17/10
EQC 5/17/10
Issues - Risks 5/17/10
Resources – Who does What - Assignments Spares - Maintenance 5/17/10
Budget (LLE Reviews Only) 5/17/10