An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tank Blast Process RIE3/21-3/23/2005 SPONSOR: Tom Germaine TEAM LEADER: Dan Kolda

  2. TEAM MEMBERS • Dan Kolda 71A Team Leader • Tim Dawson 71A • Dan Halverson C/444 • Dennis Litch 71A • Nathan Sherman 71A • Jesse Wymer 71A • Chris Stonecipher 71 PSNS • Michael Krier C/08 IH (C/106.21)

  3. THE TEAM

  4. LEAN TEAM • Steven Cole Lead Lean Facilitator • Laura Mills Lean Facilitator

  5. OBJECTIVE • TO REDUCE THE TIME BLASTING TANKS, WHILE MAINTAINING “FIRST TIME” REQUIRED QUALITY, HEALTH AND SAFETY.

  6. TOTAL SAVINGS • Total flow time reduced by 1.5 days = 83 hours/MBT/refit • 2 MBTs blasted ready for paint per refit = 166 hours/refit • Average 9 refits per year = 1728 hours/year • Total Annual Savings = 13.5 calendar days/year

  7. INSERT PICTURE INSERT PICTURE FUTURE STATE

  8. WASTE & OPPORTUNITY-PRIORITY MATRIX

  9. METRICS

  10. ACTION PLAN

  11. LEAN ACTION PLAN • TANK DRAWING / MAP OF CURRENT STATUS - VALUE TO JOB BRIEF • WORK THRU LUNCH • JOB BOX KIT FOR EXPENDABLES (MAINTAINED BY MACHINE OPERATOR) • USE OF AREA LIGHTS • ATTACH (AND LEAVE) LIGHT CORD AND BREATHING AIR LINE TO BLAST HOSE • DURING BLASTING - APPLY RESOURCES TO REMOVE GRIT • DO EARLIER BLOW-DOWN / SPOT BLASTING • BETTER VENTILATION FOR FINAL CLEAN (DUST COLLECTOR) • APPLY MORE VACUUM PRODUCERS (ON ORDER - PER TOM GERMAINE) • ADDITIONAL PORTABLE SHOWER FACILITIES (ADEQUATE AMOUNT) • SDO PERMISSION TO START BLASTING BY SHIFT (FROM PRE-BLAST EVENT) • QA STANDARDS - LOCAL UNDERSTANDING/AGREEMENT (SHOP/ENGINEERING) • QA STANDARDS - MAINTENANCE VS. OVERHAUL (NAVSEA) • FIND / ELEMINATE SOURCE OF HEAVY METALS • NEED EXPERIENCED / TRAINED BLASTERS • WG10 PAINTER / BLASTER P.D. (RETENTION OF EXPERIENCED WORKERS) • MORE WORK LEADERS (KNOWLEDGE TRANSFER TO NEWER WORKERS) • ACCOUNTABILITY FOR YOUR AREA OF BLASTING (WITH LEADER RESOURCE)

  12. QUESTIONS?