1 / 8

WF on NB-IoT Radio Link Monitoring Performance Test Procedure

R4-79AH-0262. 3GPP TSG-RAN WG4 #79- AH Hong Kong, 28 th – 30 th June, 2016. WF on NB-IoT Radio Link Monitoring Performance Test Procedure. Qualcomm Incorporated, …. Background. In RAN4#79, RAN4 discussed RLM test procedure

kboucher
Download Presentation

WF on NB-IoT Radio Link Monitoring Performance Test Procedure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. R4-79AH-0262 3GPP TSG-RAN WG4 #79-AH Hong Kong, 28th – 30th June, 2016 WF on NB-IoT Radio Link Monitoring Performance Test Procedure Qualcomm Incorporated, …

  2. Background • In RAN4#79, RAN4 discussed RLM test procedure • The legacy RLM tests have an SNR variation as shown in figure below • Periodic CQI transmission on UL is used to test UE IS/OOS behaviour

  3. NB-IoT RLM Test Proposal • Proposed SNR variation for OOS testing for RLM SNR1 SNR3 T2 B D C T1 A T3

  4. NB-IoT RLM Test Proposal • OOS Proposed Test Procedure • The UE behaviour in each test during time durations T1, T2, T3 shall be as follows: • During the period up to time point A, • eNB shall provide the UE with a UL grant • UE is expected to decode the UL grant, • switch to UL, and complete the UL transmission • UE switches back to DL • During the period from time point A to time point B, • SNR shall be linearly decreases from SNR 1 to SNR 3 • During the period from time point B to time point D, • Option 1 • eNB shall provide the UE with a UL grant • UE is expected to decode the UL grant, • UE switches back to DL • The above 3 steps are repeated ‘[10]’ times to ensure UE decoded NPDCCH at least once during T3 • Option 2 • UE initiates RRC-re-establishment procedure after T310 expires during T3 • The UE shall stop transmitting uplink signal no later than time point C and continues to keep its transmitter off until point D

  5. NB-IoT RLM Test Proposal • Test Requirements(cont’d) • The UE shall stop transmitting uplink signal at least in all sub frames configured for UL transmission according to the configured UL grant no later than time point D ([TBD] ms after the start of time duration T3). • The rate of correct events observed during repeated tests shall be at least 90%

  6. NB-IoT RLM Test Proposal • Proposed SNR variation for IS testing for RLM SNR1 SNR3 C D A B T2 T1 T3

  7. NB-IoT RLM Test Proposal • IS Proposed Test Procedure • The UE behaviour in each test during time durations T1, T2, T3 shall be as follows: • During the period up to time point B, • Option 1 • eNB shall provide the UE with a UL grant • UE is expected to decode the UL grant, • UE switches back to DL • The above 3 steps are repeated ‘[10]’ times to ensure UE decoded NPDCCH at least once during T3 • Option 2 • UE initiates RRC-re-establishment procedure after T310 expires during T3 • The UE shall stop transmitting uplink signal no later than time point C and continues to keep its transmitter off until point D • During the period from time point B to time point C, • SNR shall be linearly increases from SNR 1 to SNR 3 • During the period from time point C to time point D, • eNB shall provide the UE with a UL grant • UE is expected to decode the UL grant, • switch to UL, and complete the UL transmission • UE switches back to DL

  8. NB-IoT RLM Test Proposal • Test Requirements(cont’d) • The UE shall start transmitting uplink signal at least in all sub frames configured for UL transmission according to the configured UL grant no later than time point D ([TBD] ms after the start of time duration T3) • The rate of correct events observed during repeated tests shall be at least 90%

More Related