80 likes | 197 Views
CMA on-site 2 Announcement. Is it possible to measure WFD priority substances with currently applied methods at WFD relevant levels? Adressed to: Laboratories organising, commissioning and performing WFD compliance checking. CMA on-site 2. 17.+18.9.2008 Budapest Hungary Danube River
E N D
CMA on-site 2Announcement May 2008
Is it possible to measure WFD priority substances with currently applied methods at WFD relevant levels? Adressed to: Laboratories organising, commissioning and performing WFD compliance checking May 2008
CMAon-site 2 17.+18.9.2008 Budapest Hungary Danube River Organised by JRC IES with support by ICPDR and the Slovak EI May 2008
Comparison of River water samples (whole procedure including sampling) River water extract (measurement with real sample matrix) Standard solutions (instrumental measurement only) Collaborative field study:Comparison of monitoring methods on-site May 2008
Selected (challenging) organic WFD priority substances Target Compounds PBDE PAH OCP • Polycyclic Aromatic Hydrocarbons • Polybrominated Diphenylethers • OCP (to be confirmed) • Others? • Sampling and analysis according to current WFD chemical guidance draft document and WFD EQS proposal May 2008
Currently organising • (to be confirmed) • Ship-based sampling • Flexible site selection • Sampling in main stream • Availability of laboratory space for sample preparation and packaging May 2008
ARGUS Serbian survey ship used during Joint Danube Surveys May 2008
Next step: Sending documentation and technical annex for final registration 11 interested laboratories so far In case of interest please contact E-mail: georg.hanke@jrc.it May 2008