1 / 18

Painters’ Registration On-Line

Painters’ Registration On-Line. by: Timothy Kokkinidis. Content. Background Project Team Design Photo Shoot Convert Original to Moodle Pilot Guided Tour Completion Report (to date) Challenges Where to from Here?. Background.

Download Presentation

Painters’ Registration On-Line

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Painters’ Registration On-Line by: Timothy Kokkinidis

  2. Content • Background • Project Team • Design • Photo Shoot • Convert Original to Moodle • Pilot • Guided Tour • Completion Report (to date) • Challenges • Where to from Here?

  3. Background • Painter’s Registration Board of WA (PRB) Act of Parliament 1961 - cannot conduct painting activities over $700 per job site • PRB’s jurisdiction – Carnarvon to Esperance • As of August 2012 – Jurisdiction state wide • Regional Painters – required to be licensed • Opportunity – to provide training

  4. Project Team • Team Leader – Oversee progress, facilitate team meetings, complete project documents • Content Developers • Develop learning materials, activities, quizzes and assessments • Instructional Designer • Design flow of content, program self-marking assessments/results • Multimedia Developer • Select colour, patterns, style of graphics to presentations • Pilot Lecturer • Select/induct/monitor students • Facilitate final assessment

  5. Design

  6. Photo Shoot Photographer: Mike Buswell Model: Colleen Roberts Venue: Thornlie Campus Perth WA

  7. Photo Shoot Simon Thomas Arthur Cunningham Angelo Nanos

  8. Convert Originals to Moodle Original Format Moodle Format

  9. Pilot Program - Unit Unit BSBSMB401A Establish Legal & Risk Management Requirements for Small Business • Business Regulations • Operate Small Business • Record Keeping • Calculate Charge Rate

  10. Pilot Program – Selection of Students • Previous Polytechnic West Students • Completed Cert III Painting & Decorating • Experience in External Studies • Currently living in regional area • Mature age • Basic computer literacy • Access to Resources • Computer • Email address • Cold Canvas • Made direct phone calls • Inform of new legislation • Invited to participate

  11. Pilot Program - Students Kununurra Karratha Geraldton Kalgoorlie Bunbury Kojonup Albany

  12. Pilot Program – Time Line Learning /Activities Final Assessment Student Induction Mark/ Result End of Project Jun 10th Mar 28th Apr 2nd Jun 2nd Jun 5th Jun 15th 2012

  13. Pilot Program – Induction • Initial intention was to induct students using: • On line program called “Eluminate” • Much like a telephone conference call , with added feature of visually presenting information. • Our intention was to induct them how to use the LMS “Moodle”

  14. Pilot Program – Induction • Method we opted for was to: 1st text message student to check important email sent 2nd email introductory letter of welcome to student: • with directions how to access the “Moodle” site • provide them their logon and password • and included a link to a small pre-recorded induction uploaded onto YouTUBEhttp://youtu.be/Hnx9ZPQZPaE

  15. Guided Tour – Business Unit http://mymoodle.polytechnic.wa.edu.au

  16. Completion Reportas of 30/5/2012

  17. Challenges • More instruction/direction needed to be given to compensate due to lack of face-to-face contact • Computer Literacy of Students • Website future updates – effect on our course • Time Allocation and Deadlines • Funding received did not cover hours used • 12 mths project reduced to 6 mths

  18. Where to Now from Here? • Industry Stakeholder –showcased to Building Commission • Conduct Final Assessment – under supervision • Feedback – collect, collate, analyse • Adjustments – make adjustments • Sustainability • 5 regional candidates on waiting list Semester 2/2012 • Available Semester 1/2013 to Perth metropolitan candidates as learning mode option

More Related