An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LRO SRR Project Management

  2. LRO Project Organization Current LRO GSFC Manpower Summary • XX Civil Servants • XX Support Service Contractors

  3. LRO WBS

  4. LRO Project Procedures & Guidelines Flow Down NASA Procedural Requirements Including NPR 7120.5 NASA Program and Project Management Processes and Requirements NASA On-Line Directive Information System http://nodis3.gsfc.nasa.gov/ GSFC Procedural Requirements and Technical Rules Including GPR 7120.1 NASA Program and Project Management Processes and Requirements Goddard Directive Management System http://gdms.gsfc.nasa.gov/ RLEP Program Plan 430-PLAN-000008 LRO Requirements ESMD-RQMT-0010 Status Key Released In CCB Baseline Review Draft in Development Review LRO Project Plan 431-PLAN-000002 LRO Integrated Independent Review Plan 431-PLAN-000007 LRO Work Breakdown Structure& Dictionary 431-WBS-000001 LRO Systems Engineering Management Plan 431-PLAN-000005 LRO Configuration Management Plan 431-PLAN-xxxxxx LRO Mission Requirements Document 431-RQMT-000004 LRO Mission Verification Plan 431-PLAN-000003 RLEP Mission Assurance Requirements 430-RQMT-000006 RLEP Continuous Risk Management Plan 430-PLAN-000004 LRO Risk Management Implementation Plan 431-PLAN-xxxxxx Sibling Mission Level 2 Requirements Documents (13) LRO Integration & Test Plan 431-PLAN-xxxxxx LRO Safety Plan 431-PLAN-xxxxxx LRO Reliability Plan 431-PLAN-xxxxxx LRO Instrument & Subsystem Performance Assurance Implementation Plans (7) Instrument Contracts & In-House System Implementation Plans

  5. LRO Project Control & ReportingMonthly Cycle Instrument Monthly Reporting • Contract 533 Reports – Cost Plan, Act & Var. • Schedule Status • Cost & Workforce variance Analysis • Budget Reserve Liens/Encumbrances • Technical Progress& Problems • Technical Resource margins • Top Risks and Ranking Project Analysis & Synthesis • Cost Variance & Analysis • Work Force variance & Analysis • Performance Milestone Status • Reserve Status • Schedule Slack • Technical Resource margins • Risk Identification & Ranking Report • RLEP • Pre-MSR (400) • MSR/QSR (GSFC PMC w/ESMD Attend) Spacecraft Subsystems & Ground System Monthly Reporting • SSC 533 Reports – Cost Plan, Act & Var. • H/W Procurement Cost & Performance • Schedule Status • Cost & Workforce Variance Analysis • Budget Reserve Liens/Encumbrances Requested • Technical Progress& Problems • Risks Reported thru Systems Meetings Mission Systems • Technical Risk Review, Analysis, & Tracking • Technical Resource Margins • Integration & Test plan/schedule • Technical Progress & Problems LRO generates legacy GSFC reporting products At Phase C Project level EVM products will be added.

  6. LRO Project Risk Management Flow Project Risk Reporting Risk Management Board Trade-off Safety Risks Technical Performance Risks Project Control & Implementation Risks Constraints Performance/Design Requirements Mission Success Assessments/Reliability & Risk Assessment Technical Performance Margins & Variance Technical Risk Review, Analysis, & Tracking Residual Risks and Ranking Unresolved Technical & Operations Risks System Safety, Payload Safety, & Launch Site Safety Industrial Safety, Ground Safety, Facility Safety, & OSHA Hazard Analysis – PHA, SHA, & OSHA Mission Assurance Assessment/Risk Assessment – Matrix, FTA, & PRA (as needed) Residual Risks and Ranking Unresolved Safety Risks Cost Plan, Act & Var. Cost & Workforce Variance Analysis Integration & Test Progress & Problems Budget Reserve Liens/Encumbrances Requested Residual Risks and Ranking Unresolved Programmatic Risks Risks Reported thru Systems Meetings

  7. LRO Risk ManagementTracking, Ranking, & Reporting Example LRO Manages Risk Continuously • RM Board is comprised of core systems team and senior project management. Meets monthly. • Process is guided by Risk Management Coordinator on Project Staff. • Identification of Risks accomplished by both grassroots risk identification at instrument/subsystem level and top down by management/systems identification of mission risks. • Specialized techniques applied by systems team for reliability and safety assessments. • Both reliability engineer and safety engineer are part of systems team. • LRO will develop PRAs for critical mission events Example LRO Risk # LROP-22 (in database) as reported 6/30/05

  8. LRO Lifecycle Cost Estimate Development • LRO LCC estimate is in process. POP 04-1 (FY06) POP 05-1 (FY07) Initial Guiding Boundary Conditions • 2008 launch • Delta II class LV • Accommodate Investigations sought by ORDT/AO • $400M cost target put forth in FAD Initial Grassroots Estimates • Done at subsystem level - Subsystem estimates experience based - Instruments per AO Conceptual Cost Estimates • Parametric estimate based on historical data for recent mission with similarities • Application of simple CERs by Project Refined Grassroots Estimates • Done at subsystem level - Subsystem estimates prelim. design based - Instruments per proposals, C/D/E contracts In Progress LCC estimate for Confirmation Process • Results from reconciliation of Grassroots & RAO estimates. Reviewed by GSFC PMC GSFC RAO Cost Modeling • Mission input data defined/delivered by Project In Progress