An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERA Training Manual for LBRC Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works-Community Roads of the ProductiveSafety Net Program (PSNP)

  2. LBRC Manual developed specifically for Ethiopia

  3. Target Trainees

  4. Chapter 1:

  5. Terminology:

  6. Terminology:

  7. Rural Terrain Shoulder Widths

  8. DS6

  9. DS6

  10. DS6

  11. Chapter 2:

  12. Basic Tools List 1 Measuring Tape 2 Staff rods 3 Range poles 4 Straight edge (3m long) 5 Pegs 6 Axe 7 Machete 8 Pickaxe and mattock 9 Shovel and spade 10 Hoe and forked hoe 11 Rake and spreader 12 Hammer 13 Crow bar 14 Feathers and wedges 15 Hand rammer 16 Bow saw 17 Grass cutter 18 Wheel barrow 19 Water tank with sprinkler 20 Buckets (different sizes) 21 Cylindrical roller 22 Concrete mixer & vibrators 23 Concrete pipe moulds 24 Water containers and tanks 25 Other plant, vehicles, motor cycles, tractor(s) with trailer(s) etcas appropriate 26 Dump trucks & water tankers (optional)

  13. Survey Tools & Aids for Setting Out • Pegs • Tape measures (30m & 3m) • Ranging rods • Profile boards • Protractor • Nylon fishing thread • Hand level • Triangle sets (600, 450,900,) • Sliding Hammer • Club Hammer • Metal spike • Metal Traveller • String in role • Camber board

  14. Chapter 3:

  15. Setting Out Horizontal Alignments

  16. Setting Out Horizontal Curves String Method

  17. Chapter 4:

  18. Setting Out Vertical Alignments Step by step

  19. Chapter 5:

  20. Setting Out Cross-Sections

  21. Setting Out Cross-Sections

  22. Setting Out Cross-Sections

  23. Chapter 6:

  24. Soil Properties

  25. Concrete Mix Ratios

  26. Chapter 7:

  27. Annexes:

  28. Training of Trainer Personnel on Environmentally Sound Design andImplementation of Public Works-Community Roads of the ProductiveSafety Net Program (PSNP) June 13-24, 2011 Ghion Ambassel Hotel Dessé, Ethiopia