CBA OF OPERATING PHOTOVOLTAIC SYSTEM IN PITTSBURGH. Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin. CBA FINAL PROJECT 2002. Abstract. Objective and Motivation Introduction Description of the Model Results Conclusions and Future Plans.

keely
Download Presentation

CBA FINAL PROJECT 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CBA OF OPERATING PHOTOVOLTAIC SYSTEM IN PITTSBURGH Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  2. Abstract • Objective and Motivation • Introduction • Description of the Model • Results • Conclusions and Future Plans Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  3. Objective & Motivation • Monetary Cost • Efficiency • Availability • Feasibility • Environmental Impacts • CMU Solar House 2002 Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  4. Renewable Energy Data from the U.S. • Renewable energy 8% out of total energy • Solar Energy 1% • Reference: Web Site: http://www.eia.doe.gov/emeu/ Main Products of the Office of Energy Markets and End Use: Annual energy review: renewable energy section 10.5 Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  5. CMU Solar House 2002 Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  6. BP(conventional) PV System 120V Combiner Boxes Batteries Charge Controller DC AC INV Switch

  7. PV System Key components • Conventional Solar panels has 36 cells (photovoltaic cells) • Self regulating panels • DC-inverter-AC Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  8. Cost Benefit Analysis • Comparison • PV System For a Typical House In Pittsburgh • House covered 100% by PV System • Hybrid covering the months with highest sun irradiation and House With Classical Grid-Based System Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  9. Maximum Sun Irradiation Factor (energy) KWh/ m2 For the Northeast of the U.S. is 6 KWh/m2 Web Site: http://www.eia.doe.gov/emeu/ Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  10. Description of Model Electricity Consumption Data Selection Solar Technology Geographical Factors Yearly Consumption of Avg. Household[KWh/yr] Characteristics of the Solar Panel(inefficiencies, Max. Capacity) Monthly & Daily Consumption in the Months of High Solar Irradiation(choice of 3 and 5) [Watts] Requirement of Energy considering the Solar Insolation Factor for the Region [Watts] Additional Factor from PV Panels (heating vs efficiency) Total No. of Panels from Total Requirement of electricity (Watts) / Net Production per panel (Total Area of Solar Irradiation) Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  11. Factors for Cost Estimates Cost of Panels [ $ / panel] ~ $ 500 USD No. of Panels ~ 44 Approximate Cost of Panels $ 22,000 USD Cost of Batteries [ $ / Battery] No. of Batteries ~ 40% of No. of Panels Total Cost of Batteries $ 8,500 USD Additional Installation Costs Wiring, rack for modules, connection devices, labor work and transportation ~ $ 12,345 USD Total Investment Cost $ 42, 850 USD Year 2002 Additional Costs Additional Cost for Electricity from Grid $ 525 ~ $ 430 USD / yr (with no change in consumption behavior from average household in the U.S.) Compare to the $1,000 USD of yearly spending for future O&M Activities: Replacement of Batteries Bank every 4 Years Cleaning Activities of Panel Array ~ $ 80 USD / Year Replacement of the whole PV System (solar panels, connectors, wiring, batteries, etc.) every 20 years Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  12. Case PV covers only in Months with major Sun Irradiation • Two Variations: • 3 Months with highest Sun Irradiation (June, July, August) • 5 Months (May, June, July, August, September) • Assumptions for Future Improvements in Technology • 20 and 40 yr period : Improved efficiency of panels, capacity of Peak Watts per panel, $ per panel and per battery decreases Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  13. Case 2 PV covers only in Months with major Sun Irradiation The actual average cost of Electricity from the Grid ~ $ 0.10 / KWh Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  14. Conclusions and Further Estimations – I. • Estimated cost of electricity produced by the grid connected PV system ~ 38¢/kWh • Data from studies: 25¢/kWh – 50¢/kWh • Conventional power plant: 11¢/kWh Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  15. Conclusions and Further Estimations – II. • Benefits? • Increased siting flexibility • Decreased installation lead time • Installations cause fewer disruptions • Improved aesthetics • Increased reliability • Portability • Progressive "green" image Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  16. Conclusions and Further Estimations – III. • Progressive "green" image • “Low environmental impact—they are quiet and nonpolluting (no greenhouse gas emissions).” • /Federal Energy Management Program/ • We can avoid the environmental impacts (e.g. GHG emission) of the estimated yearly 2,500 - 3,600 kWh electricity production • Is this significant compared to the environmental impacts of the PV system? Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  17. Conclusions and Further Estimations –IV. • How to make it feasible? • Net metering • Renewable Energy Pilot Program • 10% federal tax credit and accelerated depreciation on the PV system • Continuous technology improvement Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002

  18. Further Information http://www.eren.doe.gov/sunlab http://www.sandia.gov/pv http://www.arc.cmu.edu/carnegie_team http://www1.sedo.energy.wa.gov.au/renewable.asp http://www.trfund.com/sdf http://www.bccf.org http://www.sustainable.energy.sa.gov.au/pages/advisory/renewables/types/solar/technologies http://www.solarpaces.org/resources/technologies.html http://www.solarserver.de/solarmagazin Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA FINAL PROJECT 2002