1 / 21

IEEE 802.11 TGv January 2010 Agenda

IEEE 802.11 TGv January 2010 Agenda. Authors:. Date: 2010-01-21. Abstract. This presentation contains the IEEE 802.11 TGv agenda and motions for January 2010. TGv – January 2010. Call Meeting to Order

keena
Download Presentation

IEEE 802.11 TGv January 2010 Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.11 TGv January 2010 Agenda Authors: Date: 2010-01-21 Dorothy Stanley, Aruba Networks

  2. Abstract This presentation contains the IEEE 802.11 TGv agenda and motions for January 2010. Dorothy Stanley, Aruba Networks

  3. TGv – January 2010 • Call Meeting to Order • Policies and Procedures, Attendance reminder, see http://www.ieee802.org/PNP/2008-11/LMSC_OM_approved_081114.pdf • **IEEE Patent Policy http://standards.ieee.org/board/pat/pat-slideset.ppt • Are there any patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) that the participant believes may be essential for the use of that standard? Minute any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. • ***Affiliation FAQ - http://standards.ieee.org/faqs/affiliationFAQ.html • Anti-Trust FAQ - http://standards.ieee.org/resources/antitrust-guidelines.pdf • Ethics - http://www.ieee.org/portal/cms_docs/about/CoE_poster.pdf • IEEE 802.11 Policies and Procedures - http://www.ieee802.org/11/DocFiles/06/11-06-0812-03-0000-802-11-policies-and-proceedures.htm • IEEE 802 Policies and Procedures - http://www.ieee802.org/policies-and-procedures.pdf ** Read slide deck *** Note especially items #7 & #11 Dorothy Stanley, Aruba Networks

  4. TGv Agenda • Monday PM1 • Chair’s Welcome, Status, Review of Objectives • Comment Resolution – TIM Broadcast (10-0034), Timing Measurement (09-1325, 1326) • Weds PM 1 • Comment Resolution – MIB, CID 94 (10-0106-00) • Motion- CIDs 98, 315, 316, 50, 52, 22, 23, 220, 94, TFS, Channel Usage • Collocated Interference • Tuesday AM2 • Comment Resolution – Virtual AP (10-0025), Collocated Interference (10-0014), 50, 52 • Motions – Alternate Transport, TIM Broadcast • Thurs PM 1 • Timing Meas CIDs 100, 101, 317, 116 (10-0148-01) • Comment Resolution – BSS Transition Mgt (09-1298-05) • Firmware Update Notification (10-0029, 30) • Motions • Tuesday Evening • Comment Resolution – CID 222 (10-0022), TFS, Sleep Mode, DMS (09-1305), Channel Usage • Presentation – Gabor – 10-0086 • Motion – Virtual AP, Timing Meas, 222 • Thurs PM2 • Comment Resolution – Addn’l MIB changes • Motions • Plans for March, telecons • Adjourn Attendance reminder: http://newton/ **for each timeslot*** Documents: https://mentor.ieee.org/802.11/documents Dorothy Stanley, Aruba Networks

  5. January Meeting Status & Objectives • TGv Status • Draft 7.04 available • Initial Sponsor Ballot Comments available in 11-09-1122 • Initial SB passed, 80+%, 327 comments • Meeting Objectives • Comment Resolution • SB Recirculation Letter Ballot Dorothy Stanley, Aruba Networks

  6. TGv Schedule History • Wireless Network Management SG formed – Jan 2004 • Wireless Networks Management TG formed – Nov 2004 • Call for proposals – Sept 2005 • Base line accepted - January 06 • Submissions addressing objectives - Started in March 06 • TG Ad-Hoc Draft Internal Review - October 06 to present • LB 108 Results: 132 yes -77 no -38 abstain, 63% approval, comments in 11-07-2368 [2006, 1451T, 555E] • LB 123 Results: 126 yes, 62 no, 34 abstain, 67% approval, comments in 11-08-0265 [1034, 820T, 214E] • LB 133 Results: 106 yes, 47 no, 28 abstain, 69% approval, comments in 11-08-0801 [1414, 784T, 629E] • LB 140 Results: 149 yes, 36 no, 40 abstain, 80% approval, comments in 11-08-1467 [586, 418T, 168E] • LB 146 Results: 155 yes, 32 no, 41 abstain, 83% approval, comments in 09-434, [321, 225T, 96E] • LB150 Results: 172 yes, 20 no, 38 abstain, 89% approval, comments in 09-676, [140, 93T, 47E] • LB155 Results: 176 yes, 16 no, 38 abstain, 92% approval, comments in 09-929, [24, 12T, 12E] • SB1 Results: 105 yes, 26 no, 6 abstain, 80.8% approval, comments in 09-1122, [327, 180T, 123E, 24G] Dorothy Stanley, Aruba Networks

  7. TGv Timeline – Updated Sept, 2009 • Initial Working Group Letter Ballot: July 07 – completed • Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0 • Re-circulation Working Group Letter Ballot: November 08 (D4.0) • Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged) • Form Sponsor Ballot Pool: August 09 (was June 09) • Initial Sponsor Ballot: Oct 09 • Oct 09 – D7.0 (was Sept 09) • Approved Sponsor Ballot: Nov 09 • Jan 09 – D8.0, Feb D9.0, March D10.0, April D11.0 • May 12th ( or so) for Revcom June Approval • Final WG/EC Approval: July 2010 • RevCom/Standards Board Approval: June 4th/June 5th(or so) • Note: TGv PAR is authorized through Dec 2010 Dorothy Stanley, Aruba Networks

  8. No Changes, no new valid DISAPPROVE votes, all conditions met TGv Dates & Info 7 days Sept 25-2Oct 7 days WG recirc ballots Final Change draft “Conditions met” Note to EC no new valid DISAPPROVE votes myBallot Tools 4 • EC Presentation • Unsatisfied Comments • Comment resolutions • Ballot schedule • See clause 13 D7.0 23Jul-7Aug • SB Package • Draft • Redline • Cover letter D4.0, 5.0, 6.0 Submit to Kipness Begin SB SB Comment resolution 1 Mandatory 17Jul09 5Oct09 – 4Nov09 2 1Jun09 30 days Request Review Start Close Editorial Coordination Mandatory Editorial Coordination - Jan10 D8.0 - Feb/Mar10 D9.0 - Mar/Apr10 D10.0 - Mar (cond) or July EC to Revcom - June or Sept RevCom to SB 17Aug09 TG chair SB Group Formation Request 3 Amendment Specific Sponsor Ballot Group 802 chair SB Group Formation Approval Submit to Kipness Min 30 days Open Invitation Close Invitation WG chair SB Group Formation Request 1 Oct09 Generic Sponsor Balloter Pool Dorothy Stanley, Aruba Networks

  9. TGv D7.0 Content Summary • BSS Transition Management for Network Load Balancing • Channel Usage • Co-located Interference Reporting • Diagnostic Reporting • Directed Multicast Service • Event Reporting • Flexible Broadcast/Multicast service • Multicast Diagnostics Reporting • Multiple BSSID Support • Multiple SSID • Proxy ARP • Location, Timing Measurement • TIM Broadcast • TFS • Sleep Mode • Approximately 340 Pages of content Dorothy Stanley, Aruba Networks

  10. Jan- Mar 2010 Meeting Planning • Objectives • Comment Resolution • Sponsor Ballot Recirculation • Conference Calls • Tues Feb 16, March 2, March 9 • Ad-Hoc meeting - none Dorothy Stanley, Aruba Networks

  11. Motion 1 • Move to adopt the agenda in 11-10-0031-01-000v-TGv-January-2010-agenda. • Mover:Unanimous • Seconder: • Result: Dorothy Stanley, Aruba Networks

  12. Motion 2 • Move to approve the meeting minutes in 11-09-1166-00-000v-tgv-november-2009-meeting-minutes.doc and 11-09-1307-03-000v-TGv-Dec-09-Jan-10-telecon-meeting-notes.doc. • Mover: Unanimous • Seconder: • Result: Dorothy Stanley, Aruba Networks

  13. Motion 3 • Move to • Resolve General CIDs 255 and 256 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/09/11-09-0598-06-000v-alternative-transport-for-reports.doc “ • Adopt the TIM Broadcast category comment resolutions in 10-0034-00 • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments. • Moved: Allan Thomson • Seconded: Roger Durand • Result: 10-0-3 Passes Dorothy Stanley, Aruba Networks

  14. Motion 4 • Move to • Adopt the comment resolutions for “accepted”, “disagree” and “principle” Timing Measurement category comments in 09-1325-03, except for CIDs 100, 101, 116, and 317. • Adopt the comment resolutions for “accepted”, “disagree” and “principle” Virtual AP category comments in 10-0025-02, except for CID 253 • Resolve CID 222 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0022-00-000v-sb-cid-222-rx-plcp-procedure.doc “ • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments. • Moved: Brian Hart • Seconded:Allan Thomson • Result: 8-0-1 Passes Dorothy Stanley, Aruba Networks

  15. Motion 5 • Move to • Resolve CIDs 98 and 315 as “Disagree” with a resolution detail of “The comment and the proposed change lack sufficient detail to be implemented” • Resolve CID 316 as “Disagree” with a resolution detail of “The AP and STA behaviors are specified in 11.22.8” • Adopt the TFS category comment resolutions in 09-1035-02 • Adopt the Channel Usage category comment resolution in 09-1035-02 • Adopt the resolutions for CIDs 22 and 23 in 09-1192-07 • Resolve CID 220 as “Disagree” with a resolution detail of “The comment and the proposed change lack sufficient detail to be implemented” • Resolve CIDs 50 and 52 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0061-00-000v-improvements-to-11v-directed-multicast-services-dms.doc “ • Resolve CID 94 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0106-01-000v-sb-tclas-negotiation.doc “ • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments. • Moved: Allan Thomson • Seconded:Ganesh Venkatesan • Result: 8-0-1 Passes Dorothy Stanley, Aruba Networks

  16. Motion 6 • Move to • Adopt the resolutions for CIDs 71, 74, 84, 272 and 273 in 10-0014-02 (Collocated Interference) • Resolve CIDs 69, 70, 72, 73, 75, 78, 79, 80, 81, 82, 83, 85 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0131-02-000v-proposed-modifications-to-the-11v-collocated-interference-reporting-feature.doc“ • Resolve CIDs 323 and 291 as “Disagree” with a resolution detail of “The commenter has withdrawn the comment” • Incorporate the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0049-00-000v-tgv-draft7-04-mib-compilation-results.doc • In TGv Draft 7.04 P233L24, change from • The AP may decide to reject a new DMS or cancel a granted DMS at any time based on network condition, i.e. the number of associated STAs and channel load and so on. • To • The AP may decide to reject a new DMS or cancel a granted DMS at any time based on network condition, for example the number of associated STAs and channel load. • And Delete P263L40-42 and P264L51-65 and P265L1-16 references to dot11DMSMaxSTAS INTEGER, dot11DMSMaxChannelLoadForNewService INTEGER, and dot11DMSMaxChannelLoad INTEGER) • In TGv Draft 7.04, P224L23, change from • “the AP shall include at least one BSS candidate from that list with a non-zero Preference field value in the BSS Transition Candidate List Entries field” • to • “the AP should include at least one BSS candidate from that list with a non-zero Preference field value in the BSS Transition Candidate List Entries field” • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments. • Moved: Alex Ashley • Seconded: Ian Sherlock • Result:6-0-1 Passes Dorothy Stanley, Aruba Networks

  17. Motion 7 • Move to • Adopt the Sleep Mode category comments in https://mentor.ieee.org/802.11/dcn/09/11-09-1305-03-000v-sb-comments-dmstfs.xls , except for CID 125 • Resolve DMS comments 20, 21, 221as “Principle” with a resolution detail of “Adopt the text changes in https://mentor.ieee.org/802.11/dcn/10/11-10-0132-01-000v-modifications-to-the-11v-dms-feature.doc “ • Resolve CIDs 100, 101, and 317 as “disagree” with a resolution detail of “The comment and the proposed change lack sufficient detail to be implemented” • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments. • Moved: Allan Thomson • Seconded: Chris Hartman • Result: 5-0-0 Passes Dorothy Stanley, Aruba Networks

  18. Motion 8 • Move to • Approve Teleconferences • Tuesday Feb 16, March 2, March 9 • Noon Eastern • 2 hours • Moved: Qi Wang • Seconded: Peter Loc • Result: 3-1-2 Passes Dorothy Stanley, Aruba Networks

  19. Motion 9 • Move to • Adopt the changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0162-00-000v-draft-p802-11v-a1-mibs-redlines.pdf • Resolve CID 253 as “Disagree” with a resolution detail of “The code provided by the commenter does not produce the results illustrated in Annex L” • Resolve CID 254 as “Principle” with a resolution detail of “Will be applied by the Working group editor in the publication process” • Resolve CID 116 as “Disagree”, with a resolution detail of “The comment and the proposed change lack sufficient detail to be implemented” • Resolve CID 125 as “Principle” with a resolution detail of “Adopt the text changes in https://mentor.ieee.org/802.11/dcn/10/11-10-0171-00-000v-tgvsb1-cid-125 “ • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments. • Moved: Allan Thomson • Seconded: Ganesh Venkatesan • Result: 11-0-0 Passes Dorothy Stanley, Aruba Networks

  20. Motion 10 • Having approved comment resolutions for all of the comments received from the Initial Sponsor ballot on IEEE P802.11v/D7.0, instruct the editor to prepare IEEE P802.11v/D8.0 incorporating the approved resolutions and • Approve a 15 day Recirculation Sponsor Ballot on IEEE P802.11v/D8.0. • Moved: Allan Thomson • Seconded: Ian Sherlock • Result: 11-0-1 Passes Dorothy Stanley, Aruba Networks

  21. References Dorothy Stanley, Aruba Networks

More Related