All Weather Masonry Construction. International Building Code 2006 Chapter 21: Masonry Section 2104 – Construction. IBC 2104.1 MASONRY CONSTRUCTION. ACI 530.1/ASCE 6/TMS 602. Hot and Cold Weather Masonry Construction. Hot and Cold Weather Masonry Construction.
E N D
International Building Code 2006Chapter 21: MasonrySection 2104 – Construction
IBC 2104.1MASONRY CONSTRUCTION • ACI 530.1/ASCE 6/TMS 602
Hot and Cold Weather Masonry Construction • Hot and Cold Weather Masonry Construction
MSJC 530.1 – 1.8 CCOLD WEATHER CONSTRUCTION • Ambient temperature below 40°F
MSJC 530.1 – 1.8 CCOLD WEATHER CONSTRUCTION • Ambient temperature is the outdoor temperature at the time considered.
CONSTRUCTION 40°F – 32°F 32°F – 25°F 25°F – 20°F 20°F and below PROTECTION 40°F – 25°F 25°F – 20°F 20°F and below MSJC 530.1 – 1.8 CCOLD WEATHER CONSTRUCTIONAmbient Temperature
MSJC 530.1 – 1.8 C.1COLD WEATHER CONSTRUCTION • Do not lay glass units
MSJC 530.1 – 1.8 C.2.aPREPARATION • Units not less than 20°F • Units shall not contain frozen moisture • No visible ice • or snow on • surface
MSJC 530.1 – 1.8 C.2.bPREPARATION • Remove visible ice or snow from surface to receive new construction • Heat surfaces to above freezing
MSJC 530.1 – 1.8 C.3CONSTRUCTION • Work in progress • Based on ambient air temperature • Water and aggregates not to exceed 140°F for mortar and grout
MSJC 530.1 – 1.8 C.3.aCONSTRUCTIONTemperatures 40°F – 32°F(based on ambient temperature) • Mortar temperature 40°F – 120°F at time of mixing
MSJC 530.1 – 1.8 C.3.aCONSTRUCTIONTemperatures 40°F – 32°F(based on ambient temperature) • Heat water and aggregates for grout when < 32°F
MSJC 530.1 – 1.8 C.3.bCONSTRUCTIONTemperatures 32°F – 25°F(based on ambient temperature) • Mortar temperature 40°F – 120°F at time of mixing • Maintain mortar temperature above freezing until used
MSJC 530.1 – 1.8 C.3.bCONSTRUCTIONTemperatures 32°F – 25°F(based on ambient temperature) • Heat water and aggregates so that grout temperature 70°F – 120°F at time of mixing
MSJC 530.1 – 1.8 C.3.bCONSTRUCTIONTemperatures 32°F – 25°F(based on ambient temperature) • Maintain grout temperature > 70°F until placement
MSJC 530.1 – 1.8 C.3.bCONSTRUCTIONTemperatures 32°F – 25°F(based on ambient temperature) • Heat AAC units to a minimum 40°F before installation
MSJC 530.1 – 1.8 C.3.cCONSTRUCTIONTemperatures 25°F – 20°F(based on ambient temperature) • Article 1.8 C.3.b • Heat masonry surfaces to 40°F • Heat masonry to minimum 40°F prior to grouting
MSJC 530.1 – 1.8 C.3.cCONSTRUCTIONTemperatures 25°F – 20°F(based on ambient temperature) • Wind breaks or enclosures when wind velocity > 15 mph
MSJC 530.1 – 1.8 C.3.cCONSTRUCTIONTemperatures below 20°F(based on ambient temperature) • Article 1.8 C.3.c • Maintain air temperature > 32°F using enclosures and auxiliary heat
MSJC 530.1 – 1.8 C.4PROTECTION • Apply after masonry is placed • Based on anticipated minimumdaily temperature forgrouted masonry • Based on anticipated meandaily temperature for ungrouted masonry
MSJC 530.1 – 1.8 C.4.aPROTECTION • Maintain glass masonry > 40°F for 48 hours after construction
MSJC 530.1 – 1.8 C.4.bPROTECTION • Maintain AAC masonry > 32°F for 4 hours after thin-bed application
MSJC 530.1 – 1.8 C.4.cPROTECTIONTemperatures 40°F – 25°F • Weather-resistive membrane for 24 hours
MSJC 530.1 – 1.8 C.4.dPROTECTIONTemperatures 25°F – 20°F • Completely cover with weather-resistive insulating blankets or equal for 24 hours • 48 hours for grouted masonry, unless Type III portland cement
MSJC 530.1 – 1.8 C.4.ePROTECTIONTemperatures 20°F and below • Maintain above 32°F for 24 hours using heated enclosures, electric heating blankets, infrared lamps or other acceptable method • 48 hours for • grouted masonry, • unless Type III • portland cement
MSJC 530.1 – 1.8 D.1.aPREPARATIONAmbient temperature > 100°F or > 90°F w/wind > 8 mph • Mortar temperature < 120°F • Loose, damp sand
MSJC 530.1 – 1.8 D.1.bPREPARATIONAmbient temperature > 115°F or > 105°F w/wind > 8 mph • Article 1.8 D.1.a • Shade materials and mixing equipment
MSJC 530.1 – 1.8 D.2.aCONSTRUCTIONAmbient temperature > 100°For > 90°F w/wind > 8 mph • Mortar and grout < 120°F • Mixers, transport containers and mortar boards shall be flushed with cool water • Spread no more than 4 ft of mortar ahead for AAC units • Set AAC units within one minute
MSJC 530.1 – 1.8 D.2.aCONSTRUCTIONAmbient temperature > 100°For > 90°F w/wind > 8 mph • Retemper with cool water • Use mortar within 2 hours
MSJC 530.1 – 1.8 D.2.bCONSTRUCTION Ambient temperature > 115°F or > 105°F w/wind > 8 mph • Article 1.8 D.2.b • Use cool mixing water • No ice in mixing water when added to other materials
MSJC 530.1 – 1.8 D.3PROTECTIONAmbient temperature > 100°For > 90°F w/wind > 8 mph • Fog spray new construction until damp three times a day for three days