1 / 12

802.11 July 2012 Plenary Motions

802.11 July 2012 Plenary Motions. Authors:. Date: 2012-07-xx. Abstract. This document is a composite of all 802.11 sub-group motions that may be brought at the July 2012 midweek and closing plenaries. TGad. WG Motion requesting conditional approval from EC.

keira
Download Presentation

802.11 July 2012 Plenary Motions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 802.11 July 2012 Plenary Motions Authors: Date: 2012-07-xx Adrian Stephens, Intel Corporation

  2. Abstract • This document is a composite of all 802.11 sub-group motions that may be brought at the July 2012 midweek and closing plenaries. Adrian Stephens, Intel Corporation

  3. TGad Adrian Stephens, Intel Corporation

  4. WG Motion requesting conditional approval from EC • Approve document 11-12/0885r1 as the report to the IEEE 802 Executive Committee on the requirements for conditional approval to forward P802.11ad D9.0 to RevCom, and • Request the IEEE 802 Executive Committee to conditionally approve forwarding P802.11ad D9.0 to RevCom. • Moved by Eldad Perahia on behalf of TGad • TGad vote: • Moved: Solomon Trainin, Sai Nandagopalan, Result: 12-0-1 Eldad Perahia, Intel Corporation

  5. STD 802.11-2012 Adrian Stephens, Intel Corporation

  6. Motion • Move to approve the call for comment as documented in 11-12-0930-00-000-Call_for_Comment_2012.ppt. • Moved: Dorothy Stanley • Seconded: • Result: Dorothy Stanley (Aruba Networks)

  7. M.1801 Adrian Stephens, Intel Corporation

  8. Motion • Approve 802.11-12/0911r0 802.11 (Update for ITU-R M.1801) as the 802.11 input to 802.18 containing updates for ITU-R M.1801. • Moved: Peter Ecclesine • Seconded: Adrian Stephens, Intel Corporation

  9. CMMW Adrian Stephens, Intel Corporation

  10. PAR Motion • Believing that the PAR content contained in the document referenced below meets IEEE-SA guidelines, • Request that the PAR content contained in 802.11-12/0140r9 be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval to submit to NesCom. • Moved by Xioaoming Peng on behalf of CMMW SG • CMMW SG vote: • Moved: Haiming Wang, Seconded: James Yee, Result: 15-0-4 • Note -- .pdf version of PAR in nescom form is available at 11-12/0948r0 Eldad Perahia, Xiaoming Peng

  11. 5 Criteria Motion • Believing that the Five Criteria contained in the document referenced below meets IEEE 802 guidelines, • Request that the Five Criteria contained in 802.11-12/0141r7 be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval. • Moved by Xioaoming Peng on behalf of CMMW SG • CMMW SG vote: • Moved: Liang Li, Seconded: Haiming Wang, Result: 14-0-4 Eldad Perahia, Xiaoming Peng

  12. Motion to Approve Response to Comments • Move to approve 12/0937r3 as the response to comments on the CMMW PAR and 5 Criteria • Moved by Xioaoming Peng on behalf of CMMW SG • CMMW SG vote: • Moved: Haiming Wang, Seconded: Jon Rosdahl, Result: 12-0-5 Eldad Perahia, Xiaoming Peng

More Related