MTE status and plans

Recap of situation (from IEFC workshop) Orbit measurements PS instrumentation status List of measurements and studies Resources Milestones (tentative) Acknowledgements : O. Brüning , P. Collier, R. Garoby , S . Gilardoni , V. Mertens , R. Jones and BI experts. MTE status and plans.

kelda
Download Presentation

MTE status and plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recap of situation (from IEFC workshop) • Orbit measurements • PS instrumentation status • List of measurements and studies • Resources • Milestones (tentative) Acknowledgements: O. Brüning, P. Collier, R. Garoby, S. Gilardoni, V. Mertens, R. Jones and BI experts MTE status and plans M. Giovannozzi MG - PO BEMB 27/06/2011

  2. Recap of situation • The effects that blocked MTE in 2010 • Activation of septum 16 • Fluctuation of trapping efficiency in the PS • Injection trajectories fluctuations in SPS • Action plan from IEFC workshop: • Initially mainly focus on the PS to • Studies for new extraction scheme • Closure of slow bump and stability of extraction conditions. • Tests of energy fluctuations, POPS, etc. • We should aim at drawing conclusions on new extraction/dummy septum by June/July this year. • Then resume SPS injection to study • Injection (trajectory, optics) • Overall performance Delay of ~ two months on these items MG - PO BEMB 27/06/2011

  3. Orbit measurements • Create stables islands and kick a pencil beam in one island to check orbit stability: large cycle-to-cycle fluctuations observed • Crash programme to find source and, in parallel, check whether this was a measurement artifact. • Last Thursday BI experts found the solution! Units are tenths of mm! Different colours refer to different cycles Same scale as previous case: fluctuations have disappeared Now, the real measurements can start! MG - PO BEMB 27/06/2011

  4. PS instrumentation status (MTE) • Instrumentation not (always) performing to (pushed?) needs of MTE. • Decision to team up with LIU. • Meeting organised with Rhodri: • Technical issues (in particular of orbit measurement) • Structure for follow up of technical issues • POPS reconnection and tune measurement issue • Orbit measurement seems currently operational. • Next systems to be used: • Tune measurement • BCTs in TT2 • (FWS are already being reviewed because of LIU and LHC beams) Tune measurement with POPS: Noise on pick-up or also effect on beam? MG - PO BEMB 27/06/2011

  5. List of measurements and studies - I • Trajectory fluctuations in SPS • Closure of bumps (slow and fast) in the PS • New extraction scheme using SEH31 • Pursue studies • Trapping fluctuations • Measure cycle-to-cycle reproducibility of chromaticity at flat top. • Setting up of trapping, crossing resonance from above at 14 GeV/c. This requires changing the signs of octupoles and hence Q’’>0 (this allows testing whether local negative Q’ might be a source of fluctuations). • Setting up of trapping, crossing resonance at 2 GeV. This configuration is below transition energy, hence Q’<0 for stability. Hence Q’’<0 (as we have now) should not be an issue. Furthermore, we might get rid of PWFs and F8L. • Setting up a transverse splitting in SPS? MG - PO BEMB 27/06/2011

  6. List of measurements and studies - II • New extraction scheme using SEH31 • QKE is mandatory to close the fast bump (not good for aperture). • Check trajectory extracted beamlets. • Extraction of fifth turn. • Dummy septum in SS15 • Check extraction trajectories for MTE in SS15. • Check also trajectories of other fast extractions (e.g., nTOF and LHC). • Relocation of g-jump quadrupole. • Very pertinent comment by Oliver at the IEFC workshop: source of SPS trajectory fluctuations should not affect PS trajectories in SS15! • Faster kickers option • Mainly for ABT, ABP to check the impact on losses. MG - PO BEMB 27/06/2011

  7. Resources • Beam dynamics studies: • extremely small group of people: • Fraction of two staff • 1 fellow (re-oriented to MTE from PS2 studies in March 2011) • 1 fellow (ending in October) • 1 PhD starting in September (to be trained) • PS activities: • we rely heavily on OP for setting up (this year for the new extraction studies) and systematic data taking. • SPS activities: • We depend critically on OP for pushing the setting up and the studies at the. However, we do not consider to resume these activities before the end of the summer. MG - PO BEMB 27/06/2011

  8. Milestones (tentative) • POPS reconnection might impact on MTE. • To gain flexibility it is proposed not to restrict KFA21 polarity change to injectors’ TS (time required ~1 h access – carefully planned). • End of Aug./Beg of Sep.: report on electrostatic septum extraction scheme and losses vs. kickers’ rise time. • End of September: results on special configurations for trapping. • October: SPS tests. • November: conclusions on dummy septum. MG - PO BEMB 27/06/2011