1 / 14

Pacific Aviation Directors Workshop March 13 – 15, 2012

F ederal A viation A dministration. Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam. DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION YAP INTERNATIONAL AIRPORT PRESENTATION. Introduction.

kele
Download Presentation

Pacific Aviation Directors Workshop March 13 – 15, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Federal Aviation Administration Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION YAP INTERNATIONAL AIRPORT PRESENTATION

  2. Introduction 1. Completed Projects within the Last five (5) years 2. UPCOMING PROJECT 3.ONGOING PROJECT 4. PROPOSED PROJECT

  3. Runway Shoulders, Turnaround and Seal Coating • (June 2009 – November 2011)

  4. Y.I.A. Aircraft Rescue and Firefighting Facility Project • (April 2008 – February 2010 FRONT VIEW OF THE BLDG. FACING RUNWAY. TURN-OVER CELEBRATION SOUTHEAST SIDE OF THE BLDG. SOUTHWEST SIDE OF THE BLDG.

  5. Apron Reconstruction Project (February 2008 – December 2009 APRON EAST SIDE APRON WEST SIDE APRON WEST SIDE APRON EAST SIDE

  6. Rehabilitation, Installation of Perimeter Fencing and Upgrading of • lightings and signs • (January 2006 – September 2007)

  7. Y.I.A Terminal Facility Rehabilitation (July 2006 – September 2007). FRONT VIEW OF THE BUILDING FACING VEHICLE PARKING AREA (SOUTHSIDE). NEW DEPARTURE LOUNGE.

  8. UPCOMING PROJECTS • Departure Lounge Remodeling • New Hanger

  9. Ongoing Projects AIRPORT MASTER PLAN

  10. Proposed Projects • Yap Neighboring Island Airport Projects Ulithi Airport Fais Airport Woleai Airport Parking Lot Solar Panel Installation ARFF Building Solar Panel Installation

  11. PERIMETER FENCING AROUND THE RUNWAY. 2 (TWO) WIND CONES. RUNWAY LIGHTINGS. REHABILITATION OF DAMAGED ITEMS AT THE TERMINAL. STRIPING ALONG THE RUNWAY. ULITHI AIRPORT

  12. PERIMETER FENCING AROUND THE RUNWAY. 2 (TWO) WIND CONES. PAVEMENT RESURFACING. RUNWAY LIGHTINGS. CONSTRUCT NEW AIRPORT TERMINAL. FAIS AIRPORT

  13. PERIMETER FENCING AROUND THE RUNWAY. 2 (TWO) AIRFIELD WIND CONES. PAVEMENT RESURFACING. RUNWAY LIGHTINGS. CONSTRUCT NEW AIRPORT TERMINAL. WOLEAI AIRPORT

  14. END OF PRESENTATION “THANK YOU” “KAMMAGAR MAGAR”

More Related