1 / 1

EELD Schedule

EELD Schedule. Base. Option 1. Option 2. (4.00). (4.00). (10.00). 7/01. 2002. 2003. 2004. 2005. 2006. (2.00). (4.00). (4.00). (4.00). (4.00). Pattern Matching (5.25). .65. .10. Standalone Patterns (.75). .10. .40. .25. Hierarchical Patterns (.75). .50. .25.

kellsie
Download Presentation

EELD Schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EELD Schedule Base Option 1 Option 2 (4.00) (4.00) (10.00) 7/01 2002 2003 2004 2005 2006 (2.00) (4.00) (4.00) (4.00) (4.00) Pattern Matching (5.25) .65 .10 Standalone Patterns (.75) .10 .40 .25 Hierarchical Patterns (.75) .50 .25 Temporal Patterns (.75) .25 .50 Uncertain Patterns (.75) .50 .25 Qualitative Patterns (.75) .25 .50 Uncertain Data (.75) .25 .50 Qualitative Data (.75) User Interactions (4.25) .40 .75 .50 Pattern Editing (1.65) .35 .10 Visualizing Results (.45) .15 .30 Summarizing Results (.45) .50 .20 1.00 Control (2.75) Strategy Editing (1.70) .25 .20 Domain Ind. Strategies (.45) .20 .30 Goal/Data Driven Strategies (.50) .20 .30 Embedded Strategies (.50) 1.00 .30 Meta Strategies (1.30) Architecture (2.75) .25 .25 Centralized Server (.50) .35 .25 Decentralized Tasking (.60) .15 .50 1.00 Federated Servers (1.65) Transfer & Evaluation (3.00) System Release .15 .15 .15 .15 .15 .15 1.00 Integration and Tuning (1.90) .10 .10 .10 .10 .10 .10 .25 .25 System Evaluation (1.10)

More Related