10 likes | 131 Views
EELD UI Schedule. Base. Option 1. Option 2. 7/01. 2002. 2003. 2004. 2005. 2006. Pattern and Strategy Editing (2.15). Relational Editing (.45). Temporal Editing (.25). Uncertainty Editing (.45). Qualitative Editing (.35). Strategy Editing (.65). Result Visualization (0.95).
E N D
EELD UI Schedule Base Option 1 Option 2 7/01 2002 2003 2004 2005 2006 Pattern and Strategy Editing (2.15) Relational Editing (.45) Temporal Editing (.25) Uncertainty Editing (.45) Qualitative Editing (.35) Strategy Editing (.65) Result Visualization (0.95) SEAS Extensions (.10) SEAS Mappings (.10) Search Visualization (.55) Graph Manipulation (.20) Database (0.45) Oracle Installation (.05) OKBC Driver (.15) DBA Administration (.25) Integration (0.60) Other Contractors (.30) Infrastructure (.20) SOAP Implementation (.10) System Release