130 likes | 235 Views
T0 DCS Status. DCS Workshop 13-14 March 2006 T.Karavicheva on behalf of T0 team. Status [HV/LV]. HV/LV: a prototype of the system running, with FSM. -Standard:PVSS 3.0 + Framework + OPC 2.7 + FSM -Customized user Panel (not yet optimized). HV Sub-system. Status [FEE].
E N D
T0DCS Status DCS Workshop 13-14 March 2006 T.Karavicheva on behalf of T0 team
HV/LV: a prototype of the system running, with FSM T.Karavicheva
-Standard:PVSS 3.0 + Framework + OPC 2.7 + FSM -Customized user Panel (not yet optimized) HV Sub-system T.Karavicheva
Status [FEE] FEE (readout): very similar to TOF FEE (Fast electronic): Implement a “Lab setup”: PVSS-DIM-device is ready for~ 30%. We develop DIM server to communicate VME create via controller V1718 with PVSS. Ready in 2 weeks Implement FSM – not yet ready. Implement the PVSS configuration, archival and alarms – not yet ready Implement operations panels – not yet ready . Fast electronics crate (VDL, MPD,TVDC) V1718 VME-USB Bridge
Status [ELMB+DAC for threshold CFD] DAC ELMB +DAC • Warsaw University of Technology, Faculty of Phisics • hardware –ready RadomirKupczak, • software (PVSS, LabView)-ready Marcin Zaremba
Status [Laser Calibration] Attenuator Laser Ethernet-RS232 interface (Digi One) Detector
Attenuator sub-system: a prototype of the system running, with FSM T.Karavicheva
Laser Attenuator • Implement a “Lab setup”: PVSS-device is ready. We use DiGi ONE to communicate PC with attenuator. It tested in November 2005 • Implement FSM – ready for 100%. It tested in November 2005 • Implement the PVSS configuration, archival and alarms – PVSS configuration and alarms are ready. Archive is not ready • Implement operations panels - . We use our own panels for FSM( not yet optimized). T.Karavicheva