100 likes | 119 Views
Team update on the progress of developing a prototype remote control widget for dog owners to walk their dogs remotely via the web for Gadget Co. Design status incomplete, but feasibility criteria and specifications complete. Testing, design calcs, and drawings at 75% completion, with PDR scheduled for Nov 8, 2013.
E N D
Widget Project Update Team member1 Team member2 Team member3 Team member4 October 8, 2011
Widget Project • Brief 2 sentence description of project & deliverable. Develop a prototype remote control widget that will allow dog owners walk their dog remotely via the web. • Client: Gadget Co (Supply a graphic or picture representative of your project)
Design Status • Design status: incomplete. • Feasibility Criteria: Completed • Specifications: Complete. • Testing required for size limit: 75% complete • Preferred design has been selected. • Design calcs: 75% complete • Drawings: 75% complete • PDR scheduled: 08 Nov 2013 2:00PM, Room 204A
Preliminary Designs • Overview of favorite design approach(include 1 sketch)
Current Project Schedule • Is project on schedule? YES/NO • If NO, Why? • How will you meet your completion date? • Show Gantt chart • When did you last meet with your client? • 2 days ago.
Current Issues & Resolutions • Highlight any known problems that could delay design completion • E.g., data not avail., specs incomplete, client decease, etc. • How are you resolving the problem?
Work Assignments • What major tasks will each person be doing in the next 2 weeks. • Bill: • Fred: • Susan: • Kim:
Back up Material The next two slides are backup material to be presented ONLY if asked.
Design Feasibility Criteria • X • X • X • X • X
Design Specification • X • X • X • X • X • X