1 / 12

WISP

WISP. Follow on Reporting. WISP Reporting. PMU Count - Devices PMU Count - Substations PMU Count - Signals PDC Count System Description - From PMU to Applications High level description of the system used to deliver PMU data to applications System Performance

Download Presentation

WISP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WISP Follow on Reporting

  2. WISP Reporting • PMU Count - Devices • PMU Count - Substations • PMU Count - Signals • PDC Count • System Description - From PMU to Applications • High level description of the system used to deliver PMU data to applications • System Performance • Performance information and method used to determine. Also report performance improvements and techniques used to improve performance

  3. WISP Reporting • Data Sharing - Yes or No? • Data Sharing - Text Description • Who with, and intended use • Procedures (Operating and/or Planning) - Yes or No? • Procedures (Operating and/or Planning) - Count • Procedures (Operating and/or Planning) - Text Description • Applications using synchrophasor data - Count • Applications using synchrophasor data - Text Description • Control schemes utilizing synchrophasor data - Count • Control schemes utilizing synchrophasor data - Text Description

  4. WISP Reporting • System Performance Indicators - Count • System Performance Indicators - Text Descriptions • Changed or New system performance indicators, describe the resulting benifit • Applications and Control Schemes • Model Validation • System Dynamics • System Resiliency and Restoration • Synchrophasors used to mitigate or reduce disruption/outage • Synchrophasors used to maintain and restore following an outage • Transmission Capacity • Organizational Efficiency/Effectiveness

  5. PeakRC contact • Scott Downey • sdowney@peakrc.com

  6. Peak Reliability Synchrophasor Program

  7. Data Management • Phasor Data Availability and Accuracy • GPA PDQ Tracker • White paper on the development of a new open source product used to gather metrics on phasor data availability, which will include alarming and reporting for developing a phasor data availability dashboard • State Estimator comparison tool • White paper on the measurement errors found, how they were found, any new tools developed to find them, and how the issues were resolved or mitigated • Registry • Self-Serve Registry • Registry API • Use the registry for making historical data requests • Use the registry API for adding circuit information to COMTRADE • White paper pros / cons using CIM for model • Open PDC • Research issues with adopting open source applications • Model Validation • Use synchrophasor data to help develop missing elements in the generator models

  8. Interconnection Baseline Correlation • Data Analysis tool • Expand to generic phasor data archive analysis tool • Dynamic / Generic tool will require the development of a GUI • Non structured analytics (pattern detection) • PI data analysis • Investigate Hadoop for processing the large data sets • Determine infrastructure impacts • Investigate non-utility industry existing solutions • Include correlation of power system variables e.g. • Generator trips • Temperature etc. • Take advantage of query libraries developed in house • White paper describing the baselining tools and any correlation found with archived data and system behavior of the Western Interconnection • Documentation detailing possible actions and operational procedures to the operating community for further investigation and discussion • Historical archive • Event data automation • Semi-automatic data request • Self-serve request front end for historical data developed and deployed • Documentation of policies for distributing archived synchrophasor data

  9. Control Room Solutions • Open Source the PI Based BPA MAS Solution • WAV • Seek partners e.g. Idaho Power, PAC • Technology Options Study (ESRI Based Solution?) • Investigate new tools for display • Delivery of KML data to participants to overlay on their own systems • Phase Angle Difference pairs • Mode meter • Consider determining alarm levels of quantities to alert users to look at WAV (Reliability Messaging Tool) • Synchrophasor data delivered to members via ICCP • Determine ICCP sample delivery rate • Raw angle data vs. Pair Angle Delta • T&DCE (Montana Tech) Mode and Oscillation detection engine • Develop better architecture and API • Align work by WSU with Montana Tech DLL for interoperability • Common API • Revisit spectral estimation • Summary of improvements in accuracy, speed, and ease of use of the API to Modal Analysis Engines including documentation to enable tool use by vendors and researchers.

  10. V&R Energy grid operator’s monitoring and control assistant • Voltage Stability, Grid Control and Monitoring • SCE has initiated a separate project with V&R to develop cascading portion of the tool • Clarify the split of functionality between the real-time and off-line versions of the tool • Report describing voltage stability and linear state estimation functionality tested and deployed including inaccurate data detection and prediction of grid state after corrective action taken

  11. Phasor Gateway • Use cases and requirements • Technology Options Study • Develop costing model to compare with existing C37.118 • Summary of evaluation of the use of synchrophasor gateways for more efficient use of the Wide Area Network

  12. BPA Synchrophasor Project • PMU additions for linear state estimating • Develop and test automated controls • GPS clock availability and potential hardening • Advanced synchrophasor applications • Summary detailing completed test algorithms for production RAS system • Summary detailing deployed automated controls to control voltage following monitoring period

More Related