1 / 19

Big Thompson River Forecasting

Big Thompson River Forecasting. Eastern Colorado Area Office. Manages projects local to Colorado’s Front Range Numerous activities and responsibilities Two main projects: Colorado-Big Thompson Fryingpan-Arkansas. The Eastern Colorado Area Office in Loveland, CO.

kelvin
Download Presentation

Big Thompson River Forecasting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Big Thompson River Forecasting

  2. Eastern Colorado Area Office • Manages projects local to Colorado’s Front Range • Numerous activities and responsibilities • Two main projects: • Colorado-Big Thompson • Fryingpan-Arkansas The Eastern Colorado Area Office in Loveland, CO

  3. The Colorado-Big Thompson Project

  4. Willow Creek Dam and Reservoir

  5. The Colorado-Big Thompson Project

  6. Three Lakes Collection System

  7. Granby Dam, Reservoir and Farr Pump • Largest reservoir • Serves as “savings account” for project • One dam, three dikes • Releases to Colorado River

  8. The Colorado-Big Thompson Project

  9. Shadow Mountain Reservoir and Grand Lake Shadow Mountain Reservoir near the dam, the “boatable” canal, and Grand Lake clarity

  10. The Colorado-Big Thompson Project

  11. Alva B. Adams Tunnel • Logistical solution • Built 1940-47 • 13.1 miles long • Under RMNP • 9.5 ft in diameter

  12. The Colorado-Big Thompson Project

  13. The Colorado-Big Thompson Project

  14. The Colorado-Big Thompson Project

  15. The Colorado-Big Thompson Project Natural Inflow can be Skimmed

  16. Limited Capacity / High Variability

  17. Big Thompson Forecasting Project • CHPS FEWS System • Natural Inflow to Lake Estes • Natural Flow on North Fork at Drake • Big Thompson River at Mouth of Canyon • Forecasts • 1-hr Timestep • Short-term • Ensembles

  18. Big Thompson Forecasting Project • Implemented by Riverside • Operated 2013 by ECAO • Transferred to MBRFC in 2014 • Partnership for Forecasting • MBRFC—Day-to-day forecasting and maintenance • ECAO—Occasional forecasting and scenario investigation

  19. Thank you and Questions

More Related