50 likes | 181 Views
Gamma-ray Large Area Space Telescope. GLAST LAT System Engineering. LAT Test Planning Meeting Rich Baun SLAC rbaun@slac.stanford.edu (650) 926-3520. Agenda. LAT Level Test Sequence Redundancy Configurations. LAT Level Proposed Test Sequence. Install Radiators. Baseline. Ship to NRL.
E N D
Gamma-ray Large Area Space Telescope GLAST LAT System Engineering LAT Test Planning Meeting Rich Baun SLAC rbaun@slac.stanford.edu (650) 926-3520
Agenda • LAT Level Test Sequence • Redundancy Configurations
LAT Level Proposed Test Sequence Install Radiators Baseline Ship to NRL Post-Ship Modal Survey Sine Vibe Post-Rad Install EMI/EMC Acoustic L L L C M C L L E L C R Pre Pre Post Pre Post Axis Pre-Ship Pre-TV T-Bal T-Cycle Final Remove Radiators Pack LAT Ship to GD Weight, CG A C M C C C M L TV Chamber Aliveness Limited Performance Comprehensive Performance EMI/EMC Emissions/Susceptibility Muon Survey Post Radiator Installation Test A L C E M R