MPD 575 Design for X Design for Retool Brian Armstrong and Kim Calloway Edits by Dwayne Mattison , Keith Wanrer , Ma

MPD 575 Design for X Design for Retool Brian Armstrong and Kim Calloway Edits by Dwayne Mattison , Keith Wanrer , Mac Lunn Edits by Rolf Glaser. Design for Retool. Introduction to DFR Heuristics Key Principles of DFR Procedures for DFR Examples Conclusion. 2. Introduction to DFR.

keon
Download Presentation

MPD 575 Design for X Design for Retool Brian Armstrong and Kim Calloway Edits by Dwayne Mattison , Keith Wanrer , Ma

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MPD 575 Design for XDesign for RetoolBrian Armstrong and Kim CallowayEdits by Dwayne Mattison, Keith Wanrer, Mac LunnEdits by Rolf Glaser
  2. Design for Retool Introduction to DFR Heuristics Key Principles of DFR Procedures for DFR Examples Conclusion 2
  3. Introduction to DFR What is Design for Retool? To reequip with tools ~ Webster To revise and reorganize, especially for the purpose of updating or improving~ The Free Dictionary Utilize existing capital facilities / equipment to produce (manufacture / assemble) new and improved products ~ Kim and Brian
  4. Introduction to DFR (cont) Why Design for Retool? Easier to make running changes / incremental improvements Use Make Like Production (MLP) prototype requirements as process is well defined It’s often the only option if late changes are required or if late decisions drive component changes which in turn affect process Saves money; return on capital investment, less manufacturing engineering resource investment Reduces engineering risk as process failure modes are well understood Shorten development time; faster time to market
  5. Introduction to DFR (cont) What are the drawbacks of Design for Retool? Can limit design flexibility on all new designs for numerous reasons Undesirable component characteristics are sometimes carried forward because they are too costly in terms of process change to correct Can create apathy in the product development process where components and processes that are understood to be carry-over will not be assessed and lead to new issues Business risk that competition is using newer / better process methods obtaining edge in performance, quality and cost Old equipment and all the associated concerns with its use
  6. Design for Retool Introduction to DFR Heuristics Key Principles of DFR Procedures for DFR Examples Conclusion 6
  7. DFR Heuristics If it’s not broke then don’t fix it (but do maintain it or it will break!) The more knowledgeable the component engineer is with the current process the better the potential for incremental product improvements given the constraints of the current process Late design changes are more difficult to deal with than up front engineering assumption related changes
  8. Design for Retool Introduction to DFR Heuristics Key Principles of DFR Procedures for DFR Examples Conclusion 8
  9. DFR Principles What are the processes used to manufacture a component? How is the assembly process ordered? How are assemblies transferred from one station to another? How are components located and oriented? What tools and processes are used to manufacture the part?
  10. DFR Principles Component: Carry forward the Best in Class design features Eliminate unnecessary part features that can negatively impact tooling designs Minimize machining stock Standardize handling and assembly features Manage tolerances to insure they are not over applied Process: Eliminate unneeded processes Minimize repositioning and multiple fixture where possible Utilize capability data from existing process to ‘keep’ what works well and improve processes where capability is a concern.
  11. DFR Principles Plan to reuse process and tooling where possible Verify manufacturing requirement during the design phase to avoid unique manufacturing constraints Note: sometimes the offsets are to be found on a sub-system or system level. Balance of ‘real estate’, cost, weight or consumption
  12. Design for Retool Introduction to DFR Heuristics Key Principles of DFR Procedures for DFR Examples Conclusion 12
  13. DFR Procedures Verify Tooling requirements at the design phase Insure the In-plant tooling CAD data is up to date Conduct feasibility reviews with manufacturing to verify reuse with the new product design Use CAD Environment to understand the manufacturing tooling requirements Packaging / clearance studies
  14. DFR Procedures Insure manufacturing requirements for assembly are aligned with the retool strategy Review existing In-Plant equipment and verify with new designs Develop standards for equipment that allow for reuse Define by type the tooling and capital equipment that is common and consider new machine designs that can be standardized Use historical budgets to set priorities of key equipment to standardize Refurbish existing tooling and capital (make vs. buy decisions) along with aggressive maintenance plans to achieve cost savings Higher return on capital investments Less engineering resources shorten development time / faster launches Use capability data for manufacturing processes to drive design updates Revise and update existing manufacturing processes
  15. DFR Procedures Verify current In-Plant processes are capable to meet new design requirements Verify the existing process can be applied to new concepts Apply best in class designs and processes to new designs Apply assembly process lessons learned to new product designs
  16. DFR Procedures Use semi-production tooling (a.k.a. Production pull-a-head or Make like Production) in a production environment to develop the assembly process and support late programming timing Use production tooling with limited capabilities to support production timing or develop manufacturing process Limited capabilities include Aluminum vs. Steel Manual clamps vs. hydraulic or pneumatic cylinders Operator instruction vs. electronic Poka yoke systems Use CMM holding fixtures in place of Attribute gauges Use milling processes that are more expensive to support limited runs Use of simi-completed equipment to can reduce build timing by 40% Process capabilities can be updated and corrected in the design Use Prototype tooling in a production environment to develop the assembly process and support late programming timing Prototype tooling used for process prove-out can be used to mature the design and support launch timing but the tools will have a limited manufacturing life and may not meet all manufacturing requirements
  17. Design for Retool Introduction to DFR Heuristics Key Principles of DFR Procedures for DFR Examples Conclusion 17
  18. DFR Procedures Make Like Production Once improvements are made to a component the new design must be verified. There are many prototype phases in product development process where components must be MLP.
  19. CAD of Coyote Engine in Shipping Rack P415 10.9mm CLEARANCE - OIL FILTER TO SHIPPING RACK AA5E-6714-AA 2C3E-6A642-BB OIL COOLER
  20. MLP (Engine Engineering) Early prototypes (pre-VP), rapid prototyping, early concepts, and MLP can be supported in-house at Ford. Engine Manufacturing Development Operations (EMDO) EMDO uses process that simulate production process to produce engine components Process Sequence Material Removal Rates (wet/dry) Same locating Datums Fixtures Beech Daly Technical Center (BDTC) Inspection/Gauging methods and programs Assembly methods
  21. Examples Connecting Rod Engine Oil Cooler
  22. Connecting RodThe Right Way
  23. Connecting RodThe Right Way Increased engine speeds and increased engine specific output (HP/L) drives needed design changes to connecting rod. Need increase strength while simultaneously reducing rod weight Need to use the existing rod machining line
  24. Connecting RodThe Right Way Rod Improvements: Material change from Powdered Metal to Forged Steel Allows use of less material for weight reduction and is stronger than PM Maintain critical features for current process Rod shoulders for part transfer Clamping pads, pin-end radius for locating and rod cap gnorf Other functional improvements: Rolled threads to allow blind holes for weight reduction Lower stress concentrations Eliminate potential for chips in bolt hole Elimination of Piston Pin Bushing Reduces weight further Reduces part count and cost Tapered Pin End for weight reduction (Piston, Crank as well)
  25. Connecting RodThe Right Way The changes to the connecting rod necessitated some changes to the process as follows: The harder material required changes to boring, drilling, and grinding operations Speed and feeds had to be adjusted Fracture splitting of rod required laser notch in lieu of the traditional machining broach The laser equipment was installed where the old broach equipment was removed Some UAW push-back due to Health and Safety concerns
  26. Connecting RodThe Right Way Summary: All of the changes to the connecting rod were containable via retooling the existing manufacturing line. The improvements to the connecting rod help the overall engine system. The result is a lighter, stronger rod that in turn allows for weight reduction of the piston and crank shaft. Reducing the rotating and reciprocating mass in the engine which improves the overall engine efficiency.
  27. Engine Oil CoolerThe Wrong Way Background: In the spring of 2008 at FMC Engine Engineering. Coyote V8 engine program is in the M1D phase of GPDS with S197 as lead customer and P415 as the secondary but higher volume customer. Preliminary testing indicates engine oil temps are marginal Lubrication CPMT and Systems Engineer are concerned and request to package protect for an engine oil cooler Coyote program manager denies the request to package protect for the oil cooler stating “this engine doesn’t need an oil cooler”
  28. Engine Oil Cooler 11.5MM CLEARANCE COOLER TO BELT (NOT INCLUDING SLAP) OIL COOLER INTERFERES WITH ALTERNATOR 16.26mm OIL COOLER CLEARANCE TO FRAME RAIL OIL COOLER INTERFERES WITH DRIP SHIELD
  29. Engine Oil Cooler (Cont) The failure to package protect for an oil cooler has led to sub-standard design clearances and required process changes. Nut runners for oil pan to front cover are mounted on fixed slide driving a process sequencing change Alternator install clearance is sub-standard requiring an operator assist as well as a protective shield on cooler during assembly Oil filter protrusion results in specifying two different filters (a stubby for assembly and regular FL400 for service) EPSA cable rerouted Redesigned OFA to support additional weight of cooler Unique cooler shape results in cooler tooling cost of ½ million USD
  30. Process Verification We are measuring 15mm clearance to the stanchion. CAD said we had 17mm. The hoisting of the engine process must be level to insure the installation clearance are maintained. This this case, its is not.
  31. Engine Oil Cooler (Cont)Valley Mounted Cooler If an engine oil cooler was part of the original engineering assumptions, then more time and resources would have been available to design a product that utilizes the current process without all of the sub-standard clearances and process tear-ups. A valley mounted cooler would package nicely, but would require more time to sort through the block casting and block retooling changes.
  32. CONCEPT PACKAGE MODEL –80mm WIDTH, 39mm HEIGHT, 340mm LENGTH
  33. WATER IN TO COOLER FROM WATERJACKETS 10 dia WATER FROM COOLER TO BLOCK – 15 dia COOLED OIL TO BLOCK – 15 dia CLEAN OIL IN TO COOLER - 15 dia
  34. Engine Oil Cooler (Cont)Valley Mounted Cooler This package holds more promise than the external OFA mounted cooler previously shown. Larger cooler capacity with better heat rejection Less coolant and oil pressure loss Package constraints limited to intake, knock sensors and wire harness Fewer water / oil terminations reducing risk of leaks Requires more Retooling effort and higher cost for the larger cooler
  35. Design for Retool Introduction to DFR Heuristics Key Principles of DFR Procedures for DFR Examples Conclusion 35
  36. Conclusion Engineers who are responsible for the design and release of components should understand the whole manufacturing process related to their component and their system. Similarly, engineers should know the manufacturing process to understand what is currently possible, what is good about the current process and what they would change if they could.