An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A/E Partner Process Improvement Meeting Standard Scope of Work Sections

  2. Dave Zanetell Heidi Hirsbrunner Wendy Hilgers Tim Rogers Dave Gedeon Tom Puto Alan Blair Rick Cushing Mark Meng Team Members

  3. General Information • Scope of Work (SOW) Sections are based on CFLHD P3 Activities • Files are named to correspond to the P3 activity • A/E Consultants will now be responsible for writing subsequent Task Orders • SOW Sections and the Standard Template are located on the CFLHD Website: http://www.cflhd.gov/resources/pm/index.cfm

  4. CFLHD Website Layout

  5. Project Management Home Page

  6. SOW Sections Web Page

  7. Scope of Work Assembly • Open the Standard Template and save the file to correspond to the Task Order number (e.g. - to55sow.doc)

  8. Scope of Work Assembly (cont.) • Cut and Paste the required P3 activity SOW Sections into the outline • Insert sections so they follow the logical progression of P3 activities (B2, B3, B4, etc.)

  9. Scope of Work Assembly (cont.) • Change the highlighted sections throughout to be project specific • Add project specific activities to each section as required and highlight to be apparent • Complete the Deliverables Section

  10. Scope of Work Assembly (cont.) • Obtain Estimate Spreadsheet and complete necessary heading information • Fill in the work activities from the SOW • Submit draft SOW and Spreadsheet to FHWA COTR

  11. Recent Changes • New Format to Estimate Spreadsheet • Some P3 Activities have been separated within the estimate spreadsheet for tracking purposes • Separate estimate sheet that is pre-formatted for CFLHD use • Does not allow changes/deletions within estimate spreadsheet • Do not change column headings (personnel)

  12. Questions or Comments? • Please send comments or improvement suggestions to: PMGroup.CFL@fhwa.dot.gov • Please contact the COTR for immediate questions