1 / 9

FMC PowerPoint by Dino Leddie 28/2/13

FMC Technologies. FMC PowerPoint by Dino Leddie 28/2/13. My summary on fmc technologies. Week 1 Week 2 Week 3 Week 4 Week 5 Week 6. Week 1. Tasks 1, untangle the skipping ropes for warm up. 2, Figure out location for wind turbine.

kevlyn
Download Presentation

FMC PowerPoint by Dino Leddie 28/2/13

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FMC Technologies FMC PowerPoint by Dino Leddie 28/2/13

  2. My summary on fmc technologies • Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

  3. Week 1 • Tasks • 1, untangle the skipping ropes for warm up. • 2, Figure out location for wind turbine. • 3, Fill out application form.

  4. Week 2 • Tasks • 1, Look at the letters that we received. • 2, Present our posters. • 3, We then had to write a letter of reply.

  5. Week 3 • Tasks • 1, Got shown power point and a video about the construction of wind turbines • 2, Got given box with materials we could use to build it. • 3, We finally did our own rough sketches of the wind turbine we would want it to look like.

  6. Week 4 • Tasks • 1, We got shown a power point showing the different types of wind turbines. • 2, We got our boxes and looked at what we would need to build with. • 3, Finally we got to start building.

  7. Week 5 • Tasks • 1, We got shown on a power point all the different types of hubs. • 2, We got into our groups and started to build the hub. • 3, We got to test the turbine to se if it worked.

  8. Week 6 • Tasks • We did the proper test. • We tested it from 2 different ranges. • We got read out the scores

  9. THANKYOU FOR WATCHING • By Dino Leddie • 28/2/12

More Related